PW 29 Sunset Improvement Project Phase 1
candidate project
Design
ffa847d7-aee7-4c42-8291-f9645d64dae1
The PW 29 Sunset Improvement Project Phase 1 is an active roadway and transit project led by San Francisco Public Works (Streets & Highways) in coordination with the SFMTA, located mainly along Lincoln Way from 34th Avenue to 21st Avenue in the Sunset district, plus intersections at Crossover Drive/Fulton Street and Holloway Avenue/Beverly Street. The work includes two transit bulb-outs, median reconstruction, sidewalk paving, and retaining walls. It is currently in the design phase, with construction scheduled to run from March 2027 through December 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Streets & Highways |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways” |
| contact.email | Ellen.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Ellen.Wong@sfdpw.org” |
| contact.name | Ellen Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ellen Wong” |
| description | This is an MTA Project: 2 transit bulb outs, median reconstruction, sidewalk paving, retaining walls on Lincoln from 34th Ave to 21st Ave, Cross Over Drive and Fulton St intersection, Winston Dr, and Holloway Ave and Beverly St intersection. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: This is an MTA Project: 2 transit bulb outs, median reconstruction, sidewalk paving, retaining walls on Lincoln from 34th Ave to 21st Ave,...” |
| location.geometry | 21 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“21 published segment geometries” |
| location.street_limits | 20th Ave; 23rd Ave; 25th Ave; 25th Ave from Cabrillo St to Crossover Dr \ Fulton St; 27th Ave; 30th Ave; 34th Ave; Beverly St; Holloway Ave; Lincoln Way from 19th Ave \ Crossover Dr to 20th Ave; Lincoln Way from 21st Ave to 22nd Ave; Lincoln Way from 24th Ave to 25th Ave; Lincoln Way from 25th Ave to 26th Ave; Lincoln Way from 27th Ave to 28th Ave; Lincoln Way from 29th Ave to 30th Ave; Lincoln Way from 33rd Ave to 34th Ave |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PW 29 Sunset Improvement Project Phase 1 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW 29 Sunset Improvement Project Phase 1” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2028-12-29 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-12-29T00:00:00.000” |
| schedule.start | 2027-03-27 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-03-27T00:00:00.000” |
| source.project_id | 31731 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31731” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The PW 29 Sunset Improvement Project Phase 1 is an active roadway and transit project led by San Francisco Public... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=af9370795908e8f5315b255d660b9088fd74c704be5771e6ca7c0f6191a8f3fb” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 31731 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 21 geometries | reported | 2026-08-27 | live |
| summary | The PW 29 Sunset Improvement Project Phase 1 is an active roadway and transit project led by San Francisco Public Works (Streets & Highways) in coordination with the SFMTA, located mainly along Lincoln Way from 34th Avenue to 21st Avenue in the Sunset district, plus intersections at Crossover Drive/Fulton Street and Holloway Avenue/Beverly Street. The work includes two transit bulb-outs, median reconstruction, sidewalk paving, and retaining walls. It is currently in the design phase, with construction scheduled to run from March 2027 through December 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 21 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 20th Ave; 23rd Ave; 25th Ave; 25th Ave from Cabrillo St to Crossover Dr \ Fulton St; 27th Ave; 30th Ave; 34th Ave; Beverly St; Holloway Ave; Lincoln Way from 19th Ave \ Crossover Dr to 20th Ave; Lincoln Way from 21st Ave to 22nd Ave; Lincoln Way from 24th Ave to 25th Ave; Lincoln Way from 25th Ave to 26th Ave; Lincoln Way from 27th Ave to 28th Ave; Lincoln Way from 29th Ave to 30th Ave; Lincoln Way from 33rd Ave to 34th Ave | derived | 2026-07-17 | live |
| schedule.end | 2028-12-29 | reported | 2026-07-17 | live |
| schedule.start | 2027-03-27 | reported | 2026-07-17 | live |
| source.project_id | 31731 | reported | 2026-07-17 | live |
| contact.email | Ellen.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Ellen Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Streets & Highways | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | This is an MTA Project: 2 transit bulb outs, median reconstruction, sidewalk paving, retaining walls on Lincoln from 34th Ave to 21st Ave, Cross Over Drive and Fulton St intersection, Winston Dr, and Holloway Ave and Beverly St intersection. | reported | 2026-07-17 | live |
| name | PW 29 Sunset Improvement Project Phase 1 | reported | 2026-07-17 | live |