TF181 Civic Center Substation Upgrade
candidate project
Design
feeab634-3243-40f8-8d10-232487248d44
The TF181 Civic Center Substation Upgrade is an active San Francisco Municipal Transportation Agency project to modernize the Civic Center traction power substation. Work includes replacing the existing traction power switchgear and ancillary equipment, upgrading electrical and mechanical systems, and upgrading PG&E 12kV service conduits from existing manholes to the substation. The project is currently in the design phase. No cost figures or schedule dates have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Transportation Engineering (Capital) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)” |
| contact.email | sonny.au@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: sonny.au@sfmta.com” |
| contact.name | Sonny Au |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Sonny Au” |
| description | The project scope includes, but not limited, to the following: 1) Replace existing traction power switchgear and ancillary system equipment 2) Upgrade electrical and mechanical systems 3) Upgrade existing PG&E 12kV service conduits from existing PG&E manholes to substation entry point under sidewalk. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The project scope includes, but not limited, to the following: 1) Replace existing traction power switchgear and ancillary system...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| name | TF181 Civic Center Substation Upgrade |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: TF181 Civic Center Substation Upgrade” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Substation |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Substation” |
| source.project_id | 33746 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 33746” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The TF181 Civic Center Substation Upgrade is an active San Francisco Municipal Transportation Agency project to... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 10 resolved fields; input sha256-v2=4be03a2d0682450da436ffacf37aa0d5aa258b8270f33628e343915e559e1765” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 33746 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The TF181 Civic Center Substation Upgrade is an active San Francisco Municipal Transportation Agency project to modernize the Civic Center traction power substation. Work includes replacing the existing traction power switchgear and ancillary equipment, upgrading electrical and mechanical systems, and upgrading PG&E 12kV service conduits from existing manholes to the substation. The project is currently in the design phase. No cost figures or schedule dates have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| source.project_id | 33746 | reported | 2026-07-17 | live |
| contact.email | sonny.au@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Sonny Au | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Transportation Engineering (Capital) | reported | 2026-07-17 | live |
| project_type | Substation | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The project scope includes, but not limited, to the following: 1) Replace existing traction power switchgear and ancillary system equipment 2) Upgrade electrical and mechanical systems 3) Upgrade existing PG&E 12kV service conduits from existing PG&E manholes to substation entry point under sidewalk. | reported | 2026-07-17 | live |
| name | TF181 Civic Center Substation Upgrade | reported | 2026-07-17 | live |