TF181 Civic Center Substation Upgrade

candidate project Design feeab634-3243-40f8-8d10-232487248d44

The TF181 Civic Center Substation Upgrade is an active San Francisco Municipal Transportation Agency project to modernize the Civic Center traction power substation. Work includes replacing the existing traction power switchgear and ancillary equipment, upgrading electrical and mechanical systems, and upgrading PG&E 12kV service conduits from existing manholes to the substation. The project is currently in the design phase. No cost figures or schedule dates have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF MTA SS - Transportation Engineering (Capital) reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)”
contact.email sonny.au@sfmta.com reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: sonny.au@sfmta.com”
contact.name Sonny Au reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Sonny Au”
description The project scope includes, but not limited, to the following: 1) Replace existing traction power switchgear and ancillary system equipment 2) Upgrade electrical and mechanical systems 3) Upgrade existing PG&E 12kV service conduits from existing PG&E manholes to substation entry point under sidewalk. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: The project scope includes, but not limited, to the following: 1) Replace existing traction power switchgear and ancillary system...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
name TF181 Civic Center Substation Upgrade reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: TF181 Civic Center Substation Upgrade”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Substation reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Substation”
source.project_id 33746 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 33746”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The TF181 Civic Center Substation Upgrade is an active San Francisco Municipal Transportation Agency project to... generated llm:summarize · retrieved 2026-07-18
“generated from 10 resolved fields; input sha256-v2=4be03a2d0682450da436ffacf37aa0d5aa258b8270f33628e343915e559e1765”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Polygon', 'coordinates': [[[-122.41517660092033, 37.78008676362037], [-122.41378721665062, 37.780269077558266], [-122.41392669151939, 37.78088809362], [-122.41352972458519, 37.78090929270841], [-122.41343316506065, 37.78036235428285], [-122.41300401161827, 37.78003164536458], [-122.41460797260918, 37.77874271443408], [-122.41490301560081, 37.77895047126789], [-122.41517660092033, 37.78008676362037]]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Polygon', 'coordinates': [[[-122.4151766, 37.78008676], [-122.41378722, 37.78026908], [-122.41392669, 37.78088809], [-122.41352972, 37.78090929], [-122.41343317, 37.78036235], [-122.41300401, 37.78003165], [-122.41460797, 37.77874271], [-122.41490302, 37.77895047], [-122.4151766, 37.78008676]]]}]}

Source records

Public Works coordinated projects (DotMaps) key 33746 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The TF181 Civic Center Substation Upgrade is an active San Francisco Municipal Transportation Agency project to modernize the Civic Center traction power substation. Work includes replacing the existing traction power switchgear and ancillary equipment, upgrading electrical and mechanical systems, and upgrading PG&E 12kV service conduits from existing manholes to the substation. The project is currently in the design phase. No cost figures or schedule dates have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
source.project_id 33746 reported 2026-07-17 live
contact.email sonny.au@sfmta.com reported 2026-07-17 live
contact.name Sonny Au reported 2026-07-17 live
agency.owner SF MTA SS - Transportation Engineering (Capital) reported 2026-07-17 live
project_type Substation reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description The project scope includes, but not limited, to the following: 1) Replace existing traction power switchgear and ancillary system equipment 2) Upgrade electrical and mechanical systems 3) Upgrade existing PG&E 12kV service conduits from existing PG&E manholes to substation entry point under sidewalk. reported 2026-07-17 live
name TF181 Civic Center Substation Upgrade reported 2026-07-17 live