sfproj. every fact links to its evidence

← all projects

Fireboat Manifold Fort Mason

candidate project Design fd8663d8-326a-452a-87b8-ba7de0cc31d0

The Fireboat Manifold Fort Mason project is an active capital project by San Francisco Public Works (DPW IDC – Mechanical) to replace a manifold in the city's Emergency Firefighting Water System (AWSS), a high-pressure water supply used to fight fires. The work is located along Bay Street near Fort Mason and is currently in the design phase. No cost figures or schedule dates have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Mechanical reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Mechanical”
contact.email iqbalbhai.dhapa@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: iqbalbhai.dhapa@sfdpw.org”
contact.name Iqbal Dhapa reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Iqbal Dhapa”
description Emergency Firefighting Water System (AWSS) Manifold Replacement Project reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Emergency Firefighting Water System (AWSS) Manifold Replacement Project”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits BAY ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Fireboat Manifold Fort Mason reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Fireboat Manifold Fort Mason”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type High Pressure Water Supply reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: High Pressure Water Supply”
source.project_id 38598 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 38598”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Fireboat Manifold Fort Mason project is an active capital project by San Francisco Public Works (DPW IDC –... generated llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=784945ff7de4b4fe9ba2166fd80f537d650922eeda547454d4c645f53fa10072”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.4291031185289, 37.80364431260878], [-122.43005821647613, 37.80352276484246], [-122.43068257334298, 37.80342684724223]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.42910312, 37.80364431], [-122.43005822, 37.80352276], [-122.43068257, 37.80342685]]}]}

Source records

Public Works coordinated projects (DotMaps) key 38598 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Fireboat Manifold Fort Mason project is an active capital project by San Francisco Public Works (DPW IDC – Mechanical) to replace a manifold in the city's Emergency Firefighting Water System (AWSS), a high-pressure water supply used to fight fires. The work is located along Bay Street near Fort Mason and is currently in the design phase. No cost figures or schedule dates have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits BAY ST derived 2026-07-17 live
source.project_id 38598 reported 2026-07-17 live
contact.email iqbalbhai.dhapa@sfdpw.org reported 2026-07-17 live
contact.name Iqbal Dhapa reported 2026-07-17 live
agency.owner SF DPW IDC - Mechanical reported 2026-07-17 live
project_type High Pressure Water Supply reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Emergency Firefighting Water System (AWSS) Manifold Replacement Project reported 2026-07-17 live
name Fireboat Manifold Fort Mason reported 2026-07-17 live