11th Ave and Noriega St Sewer Replacement (JV WD-2920)

candidate project Design fd08b37d-0289-4ec7-9adf-3a913de5df25

The 11th Avenue and Noriega Street Sewer Replacement is an active sanitary sewer project in San Francisco's Sunset District, covering segments of 10th and 11th Avenues and Noriega Street between roughly 9th and 10th Avenues. Owned by San Francisco Public Works (IDC Hydraulic Division), the project is currently in the design phase, with construction scheduled to run from June 2026 to September 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2564i, WD-2920 reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2564i, WD-2920”
location.geometry 4 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“4 published segment geometries”
location.street_limits 10th Ave; 11th Ave; 11th Ave from Noriega St to Ortega St; Noriega St from 09th Ave to 10th Ave derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 11th Ave and Noriega St Sewer Replacement (JV WD-2920) reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 11th Ave and Noriega St Sewer Replacement (JV WD-2920)”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2028-09-21 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-09-21T00:00:00.000”
schedule.start 2026-06-04 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-06-04T00:00:00.000”
source.project_id 50488 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 50488”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The 11th Avenue and Noriega Street Sewer Replacement is an active sanitary sewer project in San Francisco's Sunset... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=9ce68da9868b7b8b857c81fa2589c3fe74cac3cec6e71991a07d46dfb3ffc0b5”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.46672989796757, 37.75466792317123]}, {'type': 'Point', 'coordinates': [-122.46764262756902, 37.75275620871586]}, {'type': 'LineString', 'coordinates': [[-122.467802599475, 37.75462636582328], [-122.46775516777906, 37.75443228976239], [-122.46764262740471, 37.75275620882953]]}, {'type': 'LineString', 'coordinates': [[-122.46566209226019, 37.75470928100545], [-122.46672989824124, 37.754667923101785]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4667299, 37.75466792]}, {'type': 'Point', 'coordinates': [-122.46764263, 37.75275621]}, {'type': 'LineString', 'coordinates': [[-122.4678026, 37.75462637], [-122.46775517, 37.75443229], [-122.46764263, 37.75275621]]}, {'type': 'LineString', 'coordinates': [[-122.46566209, 37.75470928], [-122.4667299, 37.75466792]]}]}

Source records

Public Works coordinated projects (DotMaps) key 50488 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 4 geometries reported 2026-08-27 live
summary The 11th Avenue and Noriega Street Sewer Replacement is an active sanitary sewer project in San Francisco's Sunset District, covering segments of 10th and 11th Avenues and Noriega Street between roughly 9th and 10th Avenues. Owned by San Francisco Public Works (IDC Hydraulic Division), the project is currently in the design phase, with construction scheduled to run from June 2026 to September 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 4 geometries reported 2026-07-17 superseded
location.street_limits 10th Ave; 11th Ave; 11th Ave from Noriega St to Ortega St; Noriega St from 09th Ave to 10th Ave derived 2026-07-17 live
schedule.end 2028-09-21 reported 2026-07-17 live
schedule.start 2026-06-04 reported 2026-07-17 live
source.project_id 50488 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2564i, WD-2920 reported 2026-07-17 live
name 11th Ave and Noriega St Sewer Replacement (JV WD-2920) reported 2026-07-17 live