Chinatown Public Health Center
candidate project
Construction
fce31c2d-ed32-4e35-85a0-6e2df5919278
The Chinatown Public Health Center is a San Francisco Public Works (Bureau of Design and Construction – Architecture) project in the Chinatown area, centered along Broadway and Mason Street between roughly Powell Street and Vallejo Street. The project is active and recently moved from design into construction, with work scheduled to run from July 2026 to January 2029. No cost figures have been published.AI-generated
Updates (1)
What has happened on this project: the agency's own announcements, documents it published, changes we detected in its records, and independent coverage. Each entry says where it came from.
-
detected Aug 5, 2026Recorded changePhase changedPhase: Design → Construction
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW BDC - Architecture |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW BDC - Architecture” |
| contact.email | Youcef.Bouhamama@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Youcef.Bouhamama@sfdpw.org” |
| contact.name | Youcef Bouhamama |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Youcef Bouhamama” |
| location.geometry | 6 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“6 published segment geometries” |
| location.street_limits | Broadway; Broadway from Mason St to Himmelmann Pl; Broadway from Powell St \ Robert C Levy Tunl to Mason St; Mason St from Broadway to Vallejo St; Mason St from Pacific Ave to Broadway |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Chinatown Public Health Center |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Chinatown Public Health Center” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-08-05
“project_phase: Construction” |
| project_type | Land |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Land” |
| schedule.end | 2029-01-02 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-01-02T00:00:00.000” |
| schedule.start | 2026-07-06 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-07-06T00:00:00.000” |
| source.project_id | 34243 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 34243” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Chinatown Public Health Center is a San Francisco Public Works (Bureau of Design and Construction –... |
generated
llm:summarize · retrieved 2026-08-05
“generated from 12 resolved fields; input sha256-v2=0ee47a41c2d6ed47cd89f4a40213c776a4b10f4fb71edbea917f845a1552d392” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-05 | field changed immaterial | |
| 2026-08-05 | phase changed |
Source records
| Public Works coordinated projects (DotMaps) | key 34243 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 6 geometries | reported | 2026-08-27 | live |
| summary | The Chinatown Public Health Center is a San Francisco Public Works (Bureau of Design and Construction – Architecture) project in the Chinatown area, centered along Broadway and Mason Street between roughly Powell Street and Vallejo Street. The project is active and recently moved from design into construction, with work scheduled to run from July 2026 to January 2029. No cost figures have been published. | generated | 2026-08-05 | live |
| location.geometry | 6 geometries | reported | 2026-08-05 | superseded |
| phase | Construction | reported | 2026-08-05 | live |
| summary | The Chinatown Public Health Center is an active capital project led by San Francisco Public Works (BDC – Architecture), currently in the design phase. The work centers on the Broadway and Mason Street area of Chinatown, spanning several nearby blocks. Construction is scheduled to run from July 2026 to January 2029. No cost figures have been published. | generated | 2026-07-18 | superseded |
| location.geometry | 6 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Broadway; Broadway from Mason St to Himmelmann Pl; Broadway from Powell St \ Robert C Levy Tunl to Mason St; Mason St from Broadway to Vallejo St; Mason St from Pacific Ave to Broadway | derived | 2026-07-17 | live |
| schedule.end | 2029-01-02 | reported | 2026-07-17 | live |
| schedule.start | 2026-07-06 | reported | 2026-07-17 | live |
| source.project_id | 34243 | reported | 2026-07-17 | live |
| contact.email | Youcef.Bouhamama@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Youcef Bouhamama | reported | 2026-07-17 | live |
| agency.owner | SF DPW BDC - Architecture | reported | 2026-07-17 | live |
| project_type | Land | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | superseded |
| status | Active | reported | 2026-07-17 | live |
| name | Chinatown Public Health Center | reported | 2026-07-17 | live |