260 Clipper St
candidate project
Design
f77b3df7-19b1-4d9d-9c1e-8bfa59a125db
The 260 Clipper St project is an active gas capital project led by PG&E in San Francisco's Noe Valley area, covering segments of 26th Street, 27th Street, and Clipper Street between Sanchez and Castro streets. The project is currently in the design phase, with construction scheduled to run through 2026. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | PG&E - Gas (Capital Planning) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: PG&E - Gas (Capital Planning)” |
| location.geometry | 4 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“4 published segment geometries” |
| location.street_limits | 26TH ST from DIAMOND ST to CASTRO ST; 27TH ST; 27TH ST from CASTRO ST to 27TH ST; CLIPPER ST from SANCHEZ ST to CASTRO ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | 260 Clipper St |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: 260 Clipper St” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Gas |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Gas” |
| schedule.end | 2026-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-31T00:00:00.000” |
| schedule.start | 2026-01-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-01-01T00:00:00.000” |
| source.project_id | 10872 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 10872” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The 260 Clipper St project is an active gas capital project led by PG&E in San Francisco's Noe Valley area, covering... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 10 resolved fields; input sha256-v2=35e9c5d5121cc23b8822e5ae2a400d886588dfaf9d2df29846cf33d5f268ae45” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 10872 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 4 geometries | reported | 2026-08-27 | live |
| summary | The 260 Clipper St project is an active gas capital project led by PG&E in San Francisco's Noe Valley area, covering segments of 26th Street, 27th Street, and Clipper Street between Sanchez and Castro streets. The project is currently in the design phase, with construction scheduled to run through 2026. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 4 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 26TH ST from DIAMOND ST to CASTRO ST; 27TH ST; 27TH ST from CASTRO ST to 27TH ST; CLIPPER ST from SANCHEZ ST to CASTRO ST | derived | 2026-07-17 | live |
| schedule.end | 2026-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2026-01-01 | reported | 2026-07-17 | live |
| source.project_id | 10872 | reported | 2026-07-17 | live |
| agency.owner | PG&E - Gas (Capital Planning) | reported | 2026-07-17 | live |
| project_type | Gas | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| name | 260 Clipper St | reported | 2026-07-17 | live |