WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St
candidate project
Construction
f0f56f85-deda-4594-8c64-42b1a66607fc
The San Francisco Public Utilities Commission's WD-2921 is a water main replacement project in the Bayview neighborhood, installing new 8- and 12-inch ductile iron pipes along Palou, Quesada, and Revere Avenues and several connecting cross streets between 3rd and Griffith Streets. The active project is in its construction phase, with work scheduled to run from April 2026 to April 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St” |
| location.geometry | 8 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“8 published segment geometries” |
| location.street_limits | HAWES ST from REVERE AVE to PALOU AVE; INGALLS ST from REVERE AVE to PALOU AVE; JENNINGS ST from REVERE AVE to PALOU AVE; KEITH ST from REVERE AVE to PALOU AVE; LANE ST from REVERE AVE to PALOU AVE; PALOU AVE; QUESADA AVE; REVERE AVE |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2028-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-04-01T00:00:00.000” |
| schedule.start | 2026-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-04-01T00:00:00.000” |
| source.project_id | 25811 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 25811” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The San Francisco Public Utilities Commission's WD-2921 is a water main replacement project in the Bayview... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=c37d0e44f1f1f48c35ed516fcba9545e9e3fdcb4a1d3485ecf4aac295c0e4eb8” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 25811 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 8 geometries | reported | 2026-08-27 | live |
| summary | The San Francisco Public Utilities Commission's WD-2921 is a water main replacement project in the Bayview neighborhood, installing new 8- and 12-inch ductile iron pipes along Palou, Quesada, and Revere Avenues and several connecting cross streets between 3rd and Griffith Streets. The active project is in its construction phase, with work scheduled to run from April 2026 to April 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 8 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | HAWES ST from REVERE AVE to PALOU AVE; INGALLS ST from REVERE AVE to PALOU AVE; JENNINGS ST from REVERE AVE to PALOU AVE; KEITH ST from REVERE AVE to PALOU AVE; LANE ST from REVERE AVE to PALOU AVE; PALOU AVE; QUESADA AVE; REVERE AVE | derived | 2026-07-17 | live |
| schedule.end | 2028-04-01 | reported | 2026-07-17 | live |
| schedule.start | 2026-04-01 | reported | 2026-07-17 | live |
| source.project_id | 25811 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Construction | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St | reported | 2026-07-17 | live |
| name | WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St | reported | 2026-07-17 | live |