Various Locations Pavement Renovation No 67B Sewer Replacement and Overhead Contact System Local Isolation

candidate project Construction f0edfb8b-4d0d-45eb-97fd-a4b0c087e5b1

This is an active roadway construction project managed by San Francisco Public Works that repaves streets and replaces sewer lines across several locations, including Appleton, Beaumont, College, and other nearby avenues. The work, which also includes overhead contact system local isolation, began in January 2025 and is scheduled to finish at the end of August 2026. No cost figures have been published.AI-generated

Updates (1)

What has happened on this project: the agency's own announcements, documents it published, changes we detected in its records, and independent coverage. Each entry says where it came from.

Current record

FieldValueProvenance
agency.owner
stale
SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email
stale
Paul.Barradas@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Paul.Barradas@sfdpw.org”
contact.name
stale
Paul Barradas reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Paul Barradas”
description
stale
2399I reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2399I”
location.geometry
stale
6 geometries reported socrata:btxj-k9uh · retrieved 2026-08-05
“6 published segment geometries”
location.street_limits
stale
Appleton Ave; Beaumont Ave; College Ave; Parker Ave; Rossi Ave; Stanyan Blvd derived socrata:btxj-k9uh · retrieved 2026-08-05
“assembled from segment on/from/to street fields”
name
stale
Various Locations Pavement Renovation No 67B Sewer Replacement and Overhead Contact System Local Isolation reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Pavement Renovation No 67B Sewer Replacement and Overhead Contact System Local Isolation”
phase
stale
Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction”
project_type
stale
Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end
stale
2026-08-31 reported socrata:btxj-k9uh · retrieved 2026-08-05
“end_date: 2026-08-31T00:00:00.000”
schedule.start
stale
2025-01-06 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-01-06T00:00:00.000”
source.project_id
stale
24266 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 24266”
status
stale
Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is an active roadway construction project managed by San Francisco Public Works that repaves streets and... generated llm:summarize · retrieved 2026-08-05
“generated from 13 resolved fields; input sha256-v2=0d4571e3cb4db7964adf8d8583fd1eab6633e71da760af5cca97ffd426708927”

Changes

2026-08-05 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.42470256197163, 37.73536987092203]}, {'type': 'Point', 'coordinates': [-122.42394878440257, 37.73884328494166]}, {'type': 'Point', 'coordinates': [-122.45338499603969, 37.77782686344195]}, {'type': 'Point', 'coordinates': [-122.45433140721411, 37.77771278900451]}, {'type': 'Point', 'coordinates': [-122.45605066232534, 37.77749934444522]}, {'type': 'Point', 'coordinates': [-122.45521694234249, 37.77759927882405]}, {'type': 'Point', 'coordinates': [-122.4666944430419, 37.78471552277665]}, {'type': 'Point', 'coordinates': [-122.46776426429234, 37.784668628379116]}, {'type': 'Point', 'coordinates': [-122.46883973857973, 37.78462090571402]}, {'type': 'LineString', 'coordinates': [[-122.46563231173636, 37.784852533311], [-122.46669444309892, 37.78471552288664]]}, {'type': 'LineString', 'coordinates': [[-122.46669444309892, 37.78471552288664], [-122.46776426434938, 37.784668628489094]]}, {'type': 'LineString', 'coordinates': [[-122.46776426434938, 37.784668628489094], [-122.4688397386321, 37.78462090564828]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.42470256197163, 37.73536987092203]}, {'type': 'Point', 'coordinates': [-122.42394878440257, 37.73884328494166]}, {'type': 'Point', 'coordinates': [-122.45338499603969, 37.77782686344195]}, {'type': 'Point', 'coordinates': [-122.45433140721411, 37.77771278900451]}, {'type': 'Point', 'coordinates': [-122.45605066232534, 37.77749934444522]}, {'type': 'Point', 'coordinates': [-122.45521694234249, 37.77759927882405]}]}
2026-08-05 field changed immaterial 08th Ave; 09th Ave; 10th Ave; Appleton Ave; Beaumont Ave; California St from 07th Ave \ Cornwall St to 08th Ave; California St from 08th Ave to 09th Ave; California St from 09th Ave to 10th Ave; College Ave; Parker Ave; Rossi Ave; Stanyan BlvdAppleton Ave; Beaumont Ave; College Ave; Parker Ave; Rossi Ave; Stanyan Blvd
2026-08-05 completion date changed 2026-07-302026-08-31

Source records

Public Works coordinated projects (DotMaps) key 24266 vanished from source 2026-08-19 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is an active roadway construction project managed by San Francisco Public Works that repaves streets and replaces sewer lines across several locations, including Appleton, Beaumont, College, and other nearby avenues. The work, which also includes overhead contact system local isolation, began in January 2025 and is scheduled to finish at the end of August 2026. No cost figures have been published. generated 2026-08-05 live
location.geometry 6 geometries reported 2026-08-05 live
location.street_limits Appleton Ave; Beaumont Ave; College Ave; Parker Ave; Rossi Ave; Stanyan Blvd derived 2026-08-05 live
schedule.end 2026-08-31 reported 2026-08-05 live
summary The Various Locations Pavement Renovation No. 67B is a roadway project by San Francisco Public Works that combines street repaving with sewer replacement and overhead contact system local isolation work. It spans a dozen segments in the Richmond and Laurel Heights areas, including stretches of California Street, along with 8th, 9th, and 10th Avenues and several nearby streets. The project is in construction, having started in January 2025 with completion scheduled for July 2026. No cost figures have been published. generated 2026-07-31 superseded
summary This is a Public Works roadway project in San Francisco, managed by the SF DPW Streets & Highways division, that combines pavement renovation with sewer replacement and overhead contact system local isolation work. The construction spans a dozen street segments in the city's western neighborhoods, including stretches of California Street and several avenues such as 8th, 9th, and 10th. The project is currently active in the construction phase, having started in January 2025 and scheduled to be completed by the end of July 2026. generated 2026-07-18 superseded
location.geometry 12 geometries reported 2026-07-17 superseded
location.street_limits 08th Ave; 09th Ave; 10th Ave; Appleton Ave; Beaumont Ave; California St from 07th Ave \ Cornwall St to 08th Ave; California St from 08th Ave to 09th Ave; California St from 09th Ave to 10th Ave; College Ave; Parker Ave; Rossi Ave; Stanyan Blvd derived 2026-07-17 superseded
schedule.end 2026-07-30 reported 2026-07-17 superseded
schedule.start 2025-01-06 reported 2026-07-17 live
source.project_id 24266 reported 2026-07-17 live
contact.email Paul.Barradas@sfdpw.org reported 2026-07-17 live
contact.name Paul Barradas reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Construction reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2399I reported 2026-07-17 live
name Various Locations Pavement Renovation No 67B Sewer Replacement and Overhead Contact System Local Isolation reported 2026-07-17 live