14-009 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets
candidate project
Design
ed0d7779-8f71-483c-ad54-f407772199df
The San Francisco Public Utilities Commission is planning to replace 8- and 24-inch ductile iron water mains along Page Street from Stanyan to Fillmore Streets, with related work on nearby Cole, Fillmore, and Steiner Streets. The active project is currently in the design phase, with construction scheduled to run from June 2025 to January 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets” |
| location.geometry | 4 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“4 published segment geometries” |
| location.street_limits | COLE ST from PAGE ST to HAIGHT ST; FILLMORE ST from HAIGHT ST to PAGE ST; PAGE ST from STANYAN ST to FILLMORE ST; STEINER ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | 14-009 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: 14-009 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2027-01-20 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-01-20T00:00:00.000” |
| schedule.start | 2025-06-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-06-01T00:00:00.000” |
| source.project_id | 16932 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 16932” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The San Francisco Public Utilities Commission is planning to replace 8- and 24-inch ductile iron water mains along... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=d7c856dd351f28b8ac9006b763d5463623a5ae8eae0ba9b6c427e98ee45c4d5c” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 16932 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 4 geometries | reported | 2026-08-27 | live |
| summary | The San Francisco Public Utilities Commission is planning to replace 8- and 24-inch ductile iron water mains along Page Street from Stanyan to Fillmore Streets, with related work on nearby Cole, Fillmore, and Steiner Streets. The active project is currently in the design phase, with construction scheduled to run from June 2025 to January 2027. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 4 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | COLE ST from PAGE ST to HAIGHT ST; FILLMORE ST from HAIGHT ST to PAGE ST; PAGE ST from STANYAN ST to FILLMORE ST; STEINER ST | derived | 2026-07-17 | live |
| schedule.end | 2027-01-20 | reported | 2026-07-17 | live |
| schedule.start | 2025-06-01 | reported | 2026-07-17 | live |
| source.project_id | 16932 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets | reported | 2026-07-17 | live |
| name | 14-009 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets | reported | 2026-07-17 | live |