PW Oceanside Treatment Plant Construction

candidate project Construction e6e6786c-9710-468c-a64c-26c05d50db67

Current record

FieldValueProvenance
agency.owner SF DPW BDC - Architecture reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW BDC - Architecture”
contact.email Reggie.Stump@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Reggie.Stump@sfdpw.org”
contact.name Reggie Stump reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Reggie Stump”
description The planning, design and construction of a new Treatment Plant, Pump Station, Office Space, and Control Rooms. The project site was originally located in the Golden Gate Park. In 2011, an alternative site at the SF Zoo overflow parking area is being considered by PUC. Currently-2013, the project site is located at the Ocenside Wasterwater Treatment Plant. PUC project budget $158M, CER construction cost for the Recycled Water Facility and the Chemical Building has been estimated at $50.26M and reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: The planning, design and construction of a new Treatment Plant, Pump Station, Office Space, and Control Rooms. The project site was originally...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“1 published segment geometries”
location.street_limits Great Hwy from Sloat Blvd to Skyline Blvd derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PW Oceanside Treatment Plant Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW Oceanside Treatment Plant Construction”
phase Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction”
project_type Land reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Land”
schedule.end 2026-08-31 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-08-31T00:00:00.000”
schedule.start 2017-10-18 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2017-10-18T00:00:00.000”
source.project_id 25938 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 25938”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 25938 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-07-17 live
location.street_limits Great Hwy from Sloat Blvd to Skyline Blvd derived 2026-07-17 live
schedule.end 2026-08-31 reported 2026-07-17 live
schedule.start 2017-10-18 reported 2026-07-17 live
source.project_id 25938 reported 2026-07-17 live
contact.email Reggie.Stump@sfdpw.org reported 2026-07-17 live
contact.name Reggie Stump reported 2026-07-17 live
agency.owner SF DPW BDC - Architecture reported 2026-07-17 live
project_type Land reported 2026-07-17 live
phase Construction reported 2026-07-17 live
status Active reported 2026-07-17 live
description The planning, design and construction of a new Treatment Plant, Pump Station, Office Space, and Control Rooms. The project site was originally located in the Golden Gate Park. In 2011, an alternative site at the SF Zoo overflow parking area is being considered by PUC. Currently-2013, the project site is located at the Ocenside Wasterwater Treatment Plant. PUC project budget $158M, CER construction cost for the Recycled Water Facility and the Chemical Building has been estimated at $50.26M and reported 2026-07-17 live
name PW Oceanside Treatment Plant Construction reported 2026-07-17 live