PW Various Locations Sewer Replacement No 17
candidate project
Design
e3bcad0e-8ed8-47e8-8a0d-902b8d830641
PW Various Locations Sewer Replacement No 17 is an active sewer and roadway project led by San Francisco Public Works (Hydraulic division) that will replace sanitary sewers at numerous scattered locations across the city, spanning more than 50 street segments including stretches of 15th Avenue, 20th Street, and Baker Street. The project is currently in the design phase, with work scheduled to run from November 2024 to November 2026. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | WW-729, 2219i |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: WW-729, 2219i” |
| location.geometry | 52 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“52 published segment geometries” |
| location.street_limits | 15th Ave; 15th Ave from California St to Clement St; 18th St; 20th St; 20th St from Mission St to San Carlos St; 21st St; 21st St from Castro St to Collingwood St; 22nd Ave; 23rd Ave; 27th Ave; 27th Ave from Balboa St to Cabrillo St; Anza St from 22nd Ave to 23rd Ave; Baker St; Baker St from Hayes St to Grove St; Broadway; Broderick St; Clay St; College Ave; College Ave from Saint Marys Ave to Crescent Ave \ Mission St; Cook St … |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PW Various Locations Sewer Replacement No 17 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW Various Locations Sewer Replacement No 17” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sanitary Sewer, Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer, Roadway” |
| schedule.end | 2026-11-15 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-11-15T00:00:00.000” |
| schedule.start | 2024-11-14 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-11-14T00:00:00.000” |
| source.project_id | 8179 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8179” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | PW Various Locations Sewer Replacement No 17 is an active sewer and roadway project led by San Francisco Public... |
generated
llm:summarize · retrieved 2026-07-17
“generated from 13 resolved fields; input sha256-v2=ad930fae782948fb74dfad62aa07c276f603190419c0b3372202861883164093” |
Source records
| Public Works coordinated projects (DotMaps) | key 8179 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| summary | PW Various Locations Sewer Replacement No 17 is an active sewer and roadway project led by San Francisco Public Works (Hydraulic division) that will replace sanitary sewers at numerous scattered locations across the city, spanning more than 50 street segments including stretches of 15th Avenue, 20th Street, and Baker Street. The project is currently in the design phase, with work scheduled to run from November 2024 to November 2026. No cost figures have been published. | generated | 2026-07-17 | live |
| location.geometry | 52 geometries | reported | 2026-07-17 | live |
| location.street_limits | 15th Ave; 15th Ave from California St to Clement St; 18th St; 20th St; 20th St from Mission St to San Carlos St; 21st St; 21st St from Castro St to Collingwood St; 22nd Ave; 23rd Ave; 27th Ave; 27th Ave from Balboa St to Cabrillo St; Anza St from 22nd Ave to 23rd Ave; Baker St; Baker St from Hayes St to Grove St; Broadway; Broderick St; Clay St; College Ave; College Ave from Saint Marys Ave to Crescent Ave \ Mission St; Cook St … | derived | 2026-07-17 | live |
| schedule.end | 2026-11-15 | reported | 2026-07-17 | live |
| schedule.start | 2024-11-14 | reported | 2026-07-17 | live |
| source.project_id | 8179 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer, Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | WW-729, 2219i | reported | 2026-07-17 | live |
| name | PW Various Locations Sewer Replacement No 17 | reported | 2026-07-17 | live |