Various Locations Sewer Replacement No 36
candidate project
Design
e2b64cef-42a1-47b9-ab86-80387dc257f3
Various Locations Sewer Replacement No. 36 is a sanitary sewer replacement project led by San Francisco Public Works, covering some two dozen street segments across the city's central and Twin Peaks-area neighborhoods, including stretches of Clarendon Avenue, Grattan Street, Clayton Street, and nearby streets. The project is currently in the design phase, with construction scheduled to run from early 2028 to April 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2689i |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2689i” |
| location.geometry | 27 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“27 published segment geometries” |
| location.street_limits | 17th St; Alma St; Aquavista Way from Skyview Way to Marview Way; Belvedere St from 17th St to Carmel St; Beulah St; Beulah St from Cole St to Shrader St; Bigler Ave; Carl St; Christopher Dr; Clarendon Ave from Bigler Ave \ Twin Peaks Blvd to Stanyan St; Clayton St from Frederick St to Carl St; Clayton St from Page St to Haight St; Cole St; Dellbrook Ave; Dellbrook Ave from Olympia Way to Starview Way; Dellbrook Ave from Starview Way to Olympia Way; Grattan St from Belvedere St to Cole St; Grattan St from Cole St to Shrader St; Grattan St from Shrader St to Stanyan St; Panorama Dr from Dellbrook Ave to Clarendon Ave … |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Various Locations Sewer Replacement No 36 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Sewer Replacement No 36” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer” |
| schedule.end | 2029-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-04-01T00:00:00.000” |
| schedule.start | 2028-01-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-01-30T00:00:00.000” |
| source.project_id | 63339 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63339” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | Various Locations Sewer Replacement No. 36 is a sanitary sewer replacement project led by San Francisco Public... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=c7e0d47f4112ae56b6d5ef96d03b65fee501fedf296fd784e621cd63528b51a6” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 63339 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 27 geometries | reported | 2026-08-27 | live |
| summary | Various Locations Sewer Replacement No. 36 is a sanitary sewer replacement project led by San Francisco Public Works, covering some two dozen street segments across the city's central and Twin Peaks-area neighborhoods, including stretches of Clarendon Avenue, Grattan Street, Clayton Street, and nearby streets. The project is currently in the design phase, with construction scheduled to run from early 2028 to April 2029. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 27 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 17th St; Alma St; Aquavista Way from Skyview Way to Marview Way; Belvedere St from 17th St to Carmel St; Beulah St; Beulah St from Cole St to Shrader St; Bigler Ave; Carl St; Christopher Dr; Clarendon Ave from Bigler Ave \ Twin Peaks Blvd to Stanyan St; Clayton St from Frederick St to Carl St; Clayton St from Page St to Haight St; Cole St; Dellbrook Ave; Dellbrook Ave from Olympia Way to Starview Way; Dellbrook Ave from Starview Way to Olympia Way; Grattan St from Belvedere St to Cole St; Grattan St from Cole St to Shrader St; Grattan St from Shrader St to Stanyan St; Panorama Dr from Dellbrook Ave to Clarendon Ave … | derived | 2026-07-17 | live |
| schedule.end | 2029-04-01 | reported | 2026-07-17 | live |
| schedule.start | 2028-01-30 | reported | 2026-07-17 | live |
| source.project_id | 63339 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2689i | reported | 2026-07-17 | live |
| name | Various Locations Sewer Replacement No 36 | reported | 2026-07-17 | live |