sfproj. every fact links to its evidence

← all projects

Joint - SFWD Lead - 47th from Fulton to Cabrillo WD-2885

candidate project Planning Pre-Planning e05205e2-6c94-469d-bc1a-d21fbe7ff551

A joint roadway paving project on 47th Avenue between Fulton and Cabrillo streets in San Francisco's Richmond District, owned by SF Public Works' Streets & Highways division. The project, led by the San Francisco Water Department, involves paving a single block that was moved from the larger Richmond Residential streets project. It is currently in early planning, with work scheduled to run from September 2024 to September 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner
stale
SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email
stale
Ramon.Kong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Ramon.Kong@sfdpw.org”
contact.name
stale
Ramon Kong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ramon Kong”
description
stale
SFWD lead project joining one paving block on 47th from Fulton to Cabrillo moved from Richmond Residential streets project. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: SFWD lead project joining one paving block on 47th from Fulton to Cabrillo moved from Richmond Residential streets project.”
location.geometry
stale
1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits
stale
47th Ave from Cabrillo St to Fulton St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name
stale
Joint - SFWD Lead - 47th from Fulton to Cabrillo WD-2885 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Joint - SFWD Lead - 47th from Fulton to Cabrillo WD-2885”
phase
stale
Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type
stale
Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end
stale
2026-09-04 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-09-04T00:00:00.000”
schedule.start
stale
2024-09-15 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-09-15T00:00:00.000”
source.project_id
stale
31363 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31363”
status
stale
Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary A joint roadway paving project on 47th Avenue between Fulton and Cabrillo streets in San Francisco's Richmond... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=0b5f5bdf8e58bcf71c455eec681ef36b37d97a907aa796225072397aef5c1cf2”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.50788818934767, 37.77335806788878], [-122.50775066566435, 37.771495033957684]]}]} → {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.50788819, 37.77335807], [-122.50775067, 37.77149503]]}]}

Source records

Public Works coordinated projects (DotMaps) key 31363 vanished from source 2026-09-05 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary A joint roadway paving project on 47th Avenue between Fulton and Cabrillo streets in San Francisco's Richmond District, owned by SF Public Works' Streets & Highways division. The project, led by the San Francisco Water Department, involves paving a single block that was moved from the larger Richmond Residential streets project. It is currently in early planning, with work scheduled to run from September 2024 to September 2026. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits 47th Ave from Cabrillo St to Fulton St derived 2026-07-17 live
schedule.end 2026-09-04 reported 2026-07-17 live
schedule.start 2024-09-15 reported 2026-07-17 live
source.project_id 31363 reported 2026-07-17 live
contact.email Ramon.Kong@sfdpw.org reported 2026-07-17 live
contact.name Ramon Kong reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description SFWD lead project joining one paving block on 47th from Fulton to Cabrillo moved from Richmond Residential streets project. reported 2026-07-17 live
name Joint - SFWD Lead - 47th from Fulton to Cabrillo WD-2885 reported 2026-07-17 live