Various Locations Pavement Renovation No 80

candidate project Planning Pre-Planning d94646d7-e750-47c1-9369-451b9c4853c7

A street repaving project led by San Francisco Public Works, this effort will resurface roadways at numerous locations across the city, including stretches of Ellis Street, Hyde Street, and Cosmo Place, spanning 74 published street segments. The project is in early pre-planning, with work scheduled to run from June 2025 through August 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Paul.Barradas@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Paul.Barradas@sfdpw.org”
contact.name Paul Barradas reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Paul Barradas”
location.geometry 74 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“74 published segment geometries”
location.street_limits Ada Ct; Cedar St; Cosmo Pl; Cosmo Pl from Ophir Aly to Jones St; Cosmo Pl from Taylor St to Trader Vic Aly; Cosmo Pl from Trader Vic Aly to Ophir Aly; Cyril Magnin St; Cyril Magnin St from Eddy St to Ellis St; Cyril Magnin St from Ellis St to Ofarrell St; Ellis St; Ellis St from Cyril Magnin St to Mason St; Ellis St from Mason St to Taylor St; Elwood St; Fern St; Fulton St; Golden Gate Ave; Harlem Aly; Hyde St; Hyde St from Bush St to Pine St; Hyde St from Ellis St to Ofarrell St … derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Various Locations Pavement Renovation No 80 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Pavement Renovation No 80”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2026-08-29 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-08-29T00:00:00.000”
schedule.start 2025-06-16 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-06-16T00:00:00.000”
source.project_id 8188 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8188”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary A street repaving project led by San Francisco Public Works, this effort will resurface roadways at numerous... generated llm:summarize · retrieved 2026-07-17
“generated from 12 resolved fields; input sha256-v2=2f1119a1d6d9871b42dd8ac5bb80b85706dbbd584b7bc53cc9485b2aad2154a0”

Source records

Public Works coordinated projects (DotMaps) key 8188 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary A street repaving project led by San Francisco Public Works, this effort will resurface roadways at numerous locations across the city, including stretches of Ellis Street, Hyde Street, and Cosmo Place, spanning 74 published street segments. The project is in early pre-planning, with work scheduled to run from June 2025 through August 2026. No cost figures have been published. generated 2026-07-17 live
location.geometry 74 geometries reported 2026-07-17 live
location.street_limits Ada Ct; Cedar St; Cosmo Pl; Cosmo Pl from Ophir Aly to Jones St; Cosmo Pl from Taylor St to Trader Vic Aly; Cosmo Pl from Trader Vic Aly to Ophir Aly; Cyril Magnin St; Cyril Magnin St from Eddy St to Ellis St; Cyril Magnin St from Ellis St to Ofarrell St; Ellis St; Ellis St from Cyril Magnin St to Mason St; Ellis St from Mason St to Taylor St; Elwood St; Fern St; Fulton St; Golden Gate Ave; Harlem Aly; Hyde St; Hyde St from Bush St to Pine St; Hyde St from Ellis St to Ofarrell St … derived 2026-07-17 live
schedule.end 2026-08-29 reported 2026-07-17 live
schedule.start 2025-06-16 reported 2026-07-17 live
source.project_id 8188 reported 2026-07-17 live
contact.email Paul.Barradas@sfdpw.org reported 2026-07-17 live
contact.name Paul Barradas reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
name Various Locations Pavement Renovation No 80 reported 2026-07-17 live