M & J Lines Muni Forward
candidate project
Design
d6a06a6e-9d15-4834-9b9e-1a8afa3e6c3f
The M & J Lines Muni Forward project is a roadway improvement effort led by San Francisco Public Works (IDC Hydraulic) along several corridors in the city's southwest, including 19th Avenue, San Jose Avenue, and Randolph Street. The project is currently in the design phase, with construction scheduled to run from the end of 2026 through the end of 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2454I |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2454I” |
| location.geometry | 10 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“10 published segment geometries” |
| location.street_limits | 19th Ave; Arch St; Baden St; Bright St; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave |
derived
socrata:btxj-k9uh · retrieved 2026-08-11
“assembled from segment on/from/to street fields” |
| name | M & J Lines Muni Forward |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: M & J Lines Muni Forward” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2027-12-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-30T00:00:00.000” |
| schedule.start | 2026-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-12-31T00:00:00.000” |
| source.project_id | 31167 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31167” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The M & J Lines Muni Forward project is a roadway improvement effort led by San Francisco Public Works (IDC... |
generated
llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=508607cc7e208f07a3a34f49cbbd35dc989394c3fcab101b6c0a6446abe36813” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-11 | field changed immaterial | |
| 2026-08-11 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 31167 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 10 geometries | reported | 2026-08-27 | live |
| summary | The M & J Lines Muni Forward project is a roadway improvement effort led by San Francisco Public Works (IDC Hydraulic) along several corridors in the city's southwest, including 19th Avenue, San Jose Avenue, and Randolph Street. The project is currently in the design phase, with construction scheduled to run from the end of 2026 through the end of 2027. No cost figures have been published. | generated | 2026-08-11 | live |
| location.geometry | 10 geometries | reported | 2026-08-11 | superseded |
| location.street_limits | 19th Ave; Arch St; Baden St; Bright St; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave | derived | 2026-08-11 | live |
| summary | The M & J Lines Muni Forward project is an active roadway project led by San Francisco Public Works (Hydraulic Infrastructure Design and Construction division), currently in the design phase. It covers streets in the city's southern neighborhoods, including 19th Avenue, San Jose Avenue, and Lakeview Avenue, along 11 published segments. Construction is scheduled to run from late 2026 through the end of 2027. No cost figures have been published. | generated | 2026-07-18 | superseded |
| location.geometry | 11 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 19th Ave; Arch St; Baden St; Bright St; Lakeview Ave; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave | derived | 2026-07-17 | superseded |
| schedule.end | 2027-12-30 | reported | 2026-07-17 | live |
| schedule.start | 2026-12-31 | reported | 2026-07-17 | live |
| source.project_id | 31167 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2454I | reported | 2026-07-17 | live |
| name | M & J Lines Muni Forward | reported | 2026-07-17 | live |