sfproj. every fact links to its evidence

← all projects

M & J Lines Muni Forward

candidate project Design d6a06a6e-9d15-4834-9b9e-1a8afa3e6c3f

The M & J Lines Muni Forward project is a roadway improvement effort led by San Francisco Public Works (IDC Hydraulic) along several corridors in the city's southwest, including 19th Avenue, San Jose Avenue, and Randolph Street. The project is currently in the design phase, with construction scheduled to run from the end of 2026 through the end of 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2454I reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2454I”
location.geometry 10 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“10 published segment geometries”
location.street_limits 19th Ave; Arch St; Baden St; Bright St; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave derived socrata:btxj-k9uh · retrieved 2026-08-11
“assembled from segment on/from/to street fields”
name M & J Lines Muni Forward reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: M & J Lines Muni Forward”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2027-12-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-30T00:00:00.000”
schedule.start 2026-12-31 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-12-31T00:00:00.000”
source.project_id 31167 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31167”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The M & J Lines Muni Forward project is a roadway improvement effort led by San Francisco Public Works (IDC... generated llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=508607cc7e208f07a3a34f49cbbd35dc989394c3fcab101b6c0a6446abe36813”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4411031342072, 37.72744684444705]}, {'type': 'Point', 'coordinates': [-122.43955183987215, 37.72923779639559]}, {'type': 'Point', 'coordinates': [-122.44006203327368, 37.72892271431133]}, {'type': 'Point', 'coordinates': [-122.46349969717164, 37.71430078007797]}, {'type': 'Point', 'coordinates': [-122.46529972118614, 37.7142869771097]}, {'type': 'Point', 'coordinates': [-122.46709432079327, 37.71427318851776]}, {'type': 'Point', 'coordinates': [-122.46979824243806, 37.71428168346137]}, {'type': 'Point', 'coordinates': [-122.4715720444782, 37.7161260717194]}, {'type': 'Point', 'coordinates': [-122.47070422666961, 37.71521290441521]}, {'type': 'Point', 'coordinates': [-122.43898319460095, 37.729588971028726]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.44110313, 37.72744684]}, {'type': 'Point', 'coordinates': [-122.43955184, 37.7292378]}, {'type': 'Point', 'coordinates': [-122.44006203, 37.72892271]}, {'type': 'Point', 'coordinates': [-122.4634997, 37.71430078]}, {'type': 'Point', 'coordinates': [-122.46529972, 37.71428698]}, {'type': 'Point', 'coordinates': [-122.46709432, 37.71427319]}, {'type': 'Point', 'coordinates': [-122.46979824, 37.71428168]}, {'type': 'Point', 'coordinates': [-122.47157204, 37.71612607]}, {'type': 'Point', 'coordinates': [-122.47070423, 37.7152129]}, {'type': 'Point', 'coordinates': [-122.43898319, 37.72958897]}]}
2026-08-11 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.45037835466213, 37.71616896497317]}, {'type': 'Point', 'coordinates': [-122.4411031342072, 37.72744684444705]}, {'type': 'Point', 'coordinates': [-122.43955183987215, 37.72923779639559]}, {'type': 'Point', 'coordinates': [-122.44006203327368, 37.72892271431133]}, {'type': 'Point', 'coordinates': [-122.46349969717164, 37.71430078007797]}, {'type': 'Point', 'coordinates': [-122.46529972118614, 37.7142869771097]}, {'type': 'Point', 'coordinates': [-122.46709432079327, 37.71427318851776]}, {'type': 'Point', 'coordinates': [-122.46979824243806, 37.71428168346137]}, {'type': 'Point', 'coordinates': [-122.4715720444782, 37.7161260717194]}, {'type': 'Point', 'coordinates': [-122.47070422666961, 37.71521290441521]}, {'type': 'Point', 'coordinates': [-122.43898319460095, 37.729588971028726]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4411031342072, 37.72744684444705]}, {'type': 'Point', 'coordinates': [-122.43955183987215, 37.72923779639559]}, {'type': 'Point', 'coordinates': [-122.44006203327368, 37.72892271431133]}, {'type': 'Point', 'coordinates': [-122.46349969717164, 37.71430078007797]}, {'type': 'Point', 'coordinates': [-122.46529972118614, 37.7142869771097]}, {'type': 'Point', 'coordinates': [-122.46709432079327, 37.71427318851776]}, {'type': 'Point', 'coordinates': [-122.46979824243806, 37.71428168346137]}, {'type': 'Point', 'coordinates': [-122.4715720444782, 37.7161260717194]}, {'type': 'Point', 'coordinates': [-122.47070422666961, 37.71521290441521]}, {'type': 'Point', 'coordinates': [-122.43898319460095, 37.729588971028726]}]}
2026-08-11 field changed immaterial 19th Ave; Arch St; Baden St; Bright St; Lakeview Ave; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave19th Ave; Arch St; Baden St; Bright St; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave

Source records

Public Works coordinated projects (DotMaps) key 31167 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 10 geometries reported 2026-08-27 live
summary The M & J Lines Muni Forward project is a roadway improvement effort led by San Francisco Public Works (IDC Hydraulic) along several corridors in the city's southwest, including 19th Avenue, San Jose Avenue, and Randolph Street. The project is currently in the design phase, with construction scheduled to run from the end of 2026 through the end of 2027. No cost figures have been published. generated 2026-08-11 live
location.geometry 10 geometries reported 2026-08-11 superseded
location.street_limits 19th Ave; Arch St; Baden St; Bright St; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave derived 2026-08-11 live
summary The M & J Lines Muni Forward project is an active roadway project led by San Francisco Public Works (Hydraulic Infrastructure Design and Construction division), currently in the design phase. It covers streets in the city's southern neighborhoods, including 19th Avenue, San Jose Avenue, and Lakeview Avenue, along 11 published segments. Construction is scheduled to run from late 2026 through the end of 2027. No cost figures have been published. generated 2026-07-18 superseded
location.geometry 11 geometries reported 2026-07-17 superseded
location.street_limits 19th Ave; Arch St; Baden St; Bright St; Lakeview Ave; Paulding St; Pilgrim Ave; Randolph St; San Jose Ave derived 2026-07-17 superseded
schedule.end 2027-12-30 reported 2026-07-17 live
schedule.start 2026-12-31 reported 2026-07-17 live
source.project_id 31167 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2454I reported 2026-07-17 live
name M & J Lines Muni Forward reported 2026-07-17 live