2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2
candidate project
Construction
d39379f6-a8db-4297-837a-c8b562b4f561
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Electrical |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Electrical” |
| contact.email | John.Sylvester@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: John.Sylvester@sfdpw.org” |
| contact.name | John Sylvester |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: John Sylvester” |
| description | Project total contractor base bid Cost is $735,425 with (1) alternate bid cost of $197,175 Project Engineer Estimate for base bid and one alternate construction cost was $1,022,278 Total of (6) six sites due to incidents of safety needs and requiring control. Automated Photo Enforcement Systems as New Red Light Camera (RLC) and/or modify (E) systems to add hardware for enforcement of addition approaches. Design-Built typical RLC system has 1 front pole/camera and 1 rear pole/camera approach. W |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Project total contractor base bid Cost is $735,425 with (1) alternate bid cost of $197,175 Project Engineer Estimate for base bid and one...” |
| location.geometry | 8 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“8 published segment geometries” |
| location.street_limits | Divisadero St; Divisadero St from Page St to Oak St; Fell St; Franklin St; Franklin St from Blackstone Ct to Lombard St; Harrison St from 06th St to Harriet St; Presidio Ave from Masonic Ave \ Pine St to Bush St \ Euclid Ave |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | 2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: 2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2026-11-02 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-11-02T00:00:00.000” |
| schedule.start | 2025-10-27 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-10-27T00:00:00.000” |
| source.project_id | 52829 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 52829” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
Source records
| Public Works coordinated projects (DotMaps) | key 52829 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 8 geometries | reported | 2026-07-17 | live |
| location.street_limits | Divisadero St; Divisadero St from Page St to Oak St; Fell St; Franklin St; Franklin St from Blackstone Ct to Lombard St; Harrison St from 06th St to Harriet St; Presidio Ave from Masonic Ave \ Pine St to Bush St \ Euclid Ave | derived | 2026-07-17 | live |
| schedule.end | 2026-11-02 | reported | 2026-07-17 | live |
| schedule.start | 2025-10-27 | reported | 2026-07-17 | live |
| source.project_id | 52829 | reported | 2026-07-17 | live |
| contact.email | John.Sylvester@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | John Sylvester | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Electrical | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Construction | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Project total contractor base bid Cost is $735,425 with (1) alternate bid cost of $197,175 Project Engineer Estimate for base bid and one alternate construction cost was $1,022,278 Total of (6) six sites due to incidents of safety needs and requiring control. Automated Photo Enforcement Systems as New Red Light Camera (RLC) and/or modify (E) systems to add hardware for enforcement of addition approaches. Design-Built typical RLC system has 1 front pole/camera and 1 rear pole/camera approach. W | reported | 2026-07-17 | live |
| name | 2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2 | reported | 2026-07-17 | live |