2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2
candidate project
Construction
d39379f6-a8db-4297-837a-c8b562b4f561
This is an active San Francisco Public Works project (managed by its Electrical division) to install and upgrade Automated Photo Enforcement red light camera systems at six locations across the city, along corridors including Divisadero Street, Franklin Street, and Presidio Avenue. The work adds new camera systems and modifies existing ones to enforce additional approaches at intersections flagged for safety needs. The contractor's base bid came to about $735,000, with an alternate bid of roughly $197,000, below the engineer's estimate of about $1 million. The project is in the construction phase, scheduled to run from late October 2025 through early November 2026.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Electrical |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Electrical” |
| contact.email | John.Sylvester@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: John.Sylvester@sfdpw.org” |
| contact.name | John Sylvester |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: John Sylvester” |
| description | Project total contractor base bid Cost is $735,425 with (1) alternate bid cost of $197,175 Project Engineer Estimate for base bid and one alternate construction cost was $1,022,278 Total of (6) six sites due to incidents of safety needs and requiring control. Automated Photo Enforcement Systems as New Red Light Camera (RLC) and/or modify (E) systems to add hardware for enforcement of addition approaches. Design-Built typical RLC system has 1 front pole/camera and 1 rear pole/camera approach. W |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Project total contractor base bid Cost is $735,425 with (1) alternate bid cost of $197,175 Project Engineer Estimate for base bid and one...” |
| location.geometry | 7 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“7 published segment geometries” |
| location.street_limits | Divisadero St; Divisadero St from Page St to Oak St; Fell St; Franklin St; Franklin St from Blackstone Ct to Lombard St; Harrison St from 06th St to Harriet St; Presidio Ave from Masonic Ave \ Pine St to Bush St \ Euclid Ave |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | 2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: 2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2026-11-02 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-11-02T00:00:00.000” |
| schedule.start | 2025-10-27 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-10-27T00:00:00.000” |
| source.project_id | 52829 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 52829” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | This is an active San Francisco Public Works project (managed by its Electrical division) to install and upgrade... |
generated
llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=415ee6cb3524d7649630482e7e1709f2762df49b872268bac716fb7c5bcefa05” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-11 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 52829 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 7 geometries | reported | 2026-08-27 | live |
| summary | This is an active San Francisco Public Works project (managed by its Electrical division) to install and upgrade Automated Photo Enforcement red light camera systems at six locations across the city, along corridors including Divisadero Street, Franklin Street, and Presidio Avenue. The work adds new camera systems and modifies existing ones to enforce additional approaches at intersections flagged for safety needs. The contractor's base bid came to about $735,000, with an alternate bid of roughly $197,000, below the engineer's estimate of about $1 million. The project is in the construction phase, scheduled to run from late October 2025 through early November 2026. | generated | 2026-08-11 | live |
| location.geometry | 7 geometries | reported | 2026-08-11 | superseded |
| summary | This project is an upgrade of San Francisco's automated red light camera enforcement systems, managed by the Public Works electrical division. Work covers six sites across the city, including locations along Divisadero, Fell, Franklin, Harrison, and Presidio streets, where new red light cameras will be installed or existing systems modified to add enforcement hardware and cameras for additional approaches. The contract carries a base bid of about $735,000 plus an alternate bid of roughly $197,000, below the engineer's estimate of about $1.02 million. The project is currently in construction, scheduled to run from late October 2025 to early November 2026. | generated | 2026-07-18 | superseded |
| location.geometry | 8 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Divisadero St; Divisadero St from Page St to Oak St; Fell St; Franklin St; Franklin St from Blackstone Ct to Lombard St; Harrison St from 06th St to Harriet St; Presidio Ave from Masonic Ave \ Pine St to Bush St \ Euclid Ave | derived | 2026-07-17 | live |
| schedule.end | 2026-11-02 | reported | 2026-07-17 | live |
| schedule.start | 2025-10-27 | reported | 2026-07-17 | live |
| source.project_id | 52829 | reported | 2026-07-17 | live |
| contact.email | John.Sylvester@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | John Sylvester | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Electrical | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Construction | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Project total contractor base bid Cost is $735,425 with (1) alternate bid cost of $197,175 Project Engineer Estimate for base bid and one alternate construction cost was $1,022,278 Total of (6) six sites due to incidents of safety needs and requiring control. Automated Photo Enforcement Systems as New Red Light Camera (RLC) and/or modify (E) systems to add hardware for enforcement of addition approaches. Design-Built typical RLC system has 1 front pole/camera and 1 rear pole/camera approach. W | reported | 2026-07-17 | live |
| name | 2274I_PW_Automated_Photo_Enforcement_System_Upgrade_Contract_2 | reported | 2026-07-17 | live |