WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets
candidate project
Design
cae06ae9-0de9-44fd-b951-3fe17259804e
The San Francisco Public Utilities Commission plans to replace aging 8-inch and 12-inch water mains along 21st Street, Hill Street, and several nearby blocks in the Noe Valley and Eureka Valley areas. The project is currently in the design phase, with construction scheduled to run from March 2026 through September 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| contact.email | jcantu@sfwater.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: jcantu@sfwater.org” |
| contact.name | Jonathan Cantu |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Jonathan Cantu” |
| description | For coordination and/or conflict contact Erik Chan; erchan@sfwater.org Napoleon Calimlim; ncalimlim@sfwater.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: For coordination and/or conflict contact Erik Chan; erchan@sfwater.org Napoleon Calimlim; ncalimlim@sfwater.org” |
| location.geometry | 10 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“10 published segment geometries” |
| location.street_limits | 20TH ST from COLLINGWOOD ST to EUREKA ST; 21ST ST from CASTRO ST to COLLINGWOOD ST; 21ST ST from CHURCH ST to CASTRO ST; 21ST ST from COLLINGWOOD ST to EUREKA ST; COLLINGWOOD ST from 21ST ST to 20TH ST; DIAMOND ST from 21ST ST to 20TH ST; HILL ST; NOE ST from 21ST ST to HILL ST; NOE ST from 21ST ST to LIBERTY ST; SANCHEZ ST from 21ST ST to HILL ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2028-09-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-09-30T00:00:00.000” |
| schedule.start | 2026-03-12 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-03-12T00:00:00.000” |
| source.project_id | 8784 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8784” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The San Francisco Public Utilities Commission plans to replace aging 8-inch and 12-inch water mains along 21st... |
generated
llm:summarize · retrieved 2026-07-17
“generated from 13 resolved fields; input sha256-v2=2f8da4f0451eef5cdb5c01300fab0d031c0d96e69c8585163e171dccf9a79363” |
Source records
| Public Works coordinated projects (DotMaps) | key 8784 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| summary | The San Francisco Public Utilities Commission plans to replace aging 8-inch and 12-inch water mains along 21st Street, Hill Street, and several nearby blocks in the Noe Valley and Eureka Valley areas. The project is currently in the design phase, with construction scheduled to run from March 2026 through September 2028. No cost figures have been published. | generated | 2026-07-17 | live |
| location.geometry | 10 geometries | reported | 2026-07-17 | live |
| location.street_limits | 20TH ST from COLLINGWOOD ST to EUREKA ST; 21ST ST from CASTRO ST to COLLINGWOOD ST; 21ST ST from CHURCH ST to CASTRO ST; 21ST ST from COLLINGWOOD ST to EUREKA ST; COLLINGWOOD ST from 21ST ST to 20TH ST; DIAMOND ST from 21ST ST to 20TH ST; HILL ST; NOE ST from 21ST ST to HILL ST; NOE ST from 21ST ST to LIBERTY ST; SANCHEZ ST from 21ST ST to HILL ST | derived | 2026-07-17 | live |
| schedule.end | 2028-09-30 | reported | 2026-07-17 | live |
| schedule.start | 2026-03-12 | reported | 2026-07-17 | live |
| source.project_id | 8784 | reported | 2026-07-17 | live |
| contact.email | jcantu@sfwater.org | reported | 2026-07-17 | live |
| contact.name | Jonathan Cantu | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | For coordination and/or conflict contact Erik Chan; erchan@sfwater.org Napoleon Calimlim; ncalimlim@sfwater.org | reported | 2026-07-17 | live |
| name | WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets | reported | 2026-07-17 | live |