WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets

candidate project Design cae06ae9-0de9-44fd-b951-3fe17259804e

The San Francisco Public Utilities Commission plans to replace aging 8-inch and 12-inch water mains along 21st Street, Hill Street, and several nearby blocks in the Noe Valley and Eureka Valley areas. The project is currently in the design phase, with construction scheduled to run from March 2026 through September 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
contact.email jcantu@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: jcantu@sfwater.org”
contact.name Jonathan Cantu reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Jonathan Cantu”
description For coordination and/or conflict contact Erik Chan; erchan@sfwater.org Napoleon Calimlim; ncalimlim@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: For coordination and/or conflict contact Erik Chan; erchan@sfwater.org Napoleon Calimlim; ncalimlim@sfwater.org”
location.geometry 10 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“10 published segment geometries”
location.street_limits 20TH ST from COLLINGWOOD ST to EUREKA ST; 21ST ST from CASTRO ST to COLLINGWOOD ST; 21ST ST from CHURCH ST to CASTRO ST; 21ST ST from COLLINGWOOD ST to EUREKA ST; COLLINGWOOD ST from 21ST ST to 20TH ST; DIAMOND ST from 21ST ST to 20TH ST; HILL ST; NOE ST from 21ST ST to HILL ST; NOE ST from 21ST ST to LIBERTY ST; SANCHEZ ST from 21ST ST to HILL ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2028-09-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-09-30T00:00:00.000”
schedule.start 2026-03-12 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-03-12T00:00:00.000”
source.project_id 8784 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8784”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The San Francisco Public Utilities Commission plans to replace aging 8-inch and 12-inch water mains along 21st... generated llm:summarize · retrieved 2026-07-17
“generated from 13 resolved fields; input sha256-v2=2f8da4f0451eef5cdb5c01300fab0d031c0d96e69c8585163e171dccf9a79363”

Source records

Public Works coordinated projects (DotMaps) key 8784 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary The San Francisco Public Utilities Commission plans to replace aging 8-inch and 12-inch water mains along 21st Street, Hill Street, and several nearby blocks in the Noe Valley and Eureka Valley areas. The project is currently in the design phase, with construction scheduled to run from March 2026 through September 2028. No cost figures have been published. generated 2026-07-17 live
location.geometry 10 geometries reported 2026-07-17 live
location.street_limits 20TH ST from COLLINGWOOD ST to EUREKA ST; 21ST ST from CASTRO ST to COLLINGWOOD ST; 21ST ST from CHURCH ST to CASTRO ST; 21ST ST from COLLINGWOOD ST to EUREKA ST; COLLINGWOOD ST from 21ST ST to 20TH ST; DIAMOND ST from 21ST ST to 20TH ST; HILL ST; NOE ST from 21ST ST to HILL ST; NOE ST from 21ST ST to LIBERTY ST; SANCHEZ ST from 21ST ST to HILL ST derived 2026-07-17 live
schedule.end 2028-09-30 reported 2026-07-17 live
schedule.start 2026-03-12 reported 2026-07-17 live
source.project_id 8784 reported 2026-07-17 live
contact.email jcantu@sfwater.org reported 2026-07-17 live
contact.name Jonathan Cantu reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description For coordination and/or conflict contact Erik Chan; erchan@sfwater.org Napoleon Calimlim; ncalimlim@sfwater.org reported 2026-07-17 live
name WD-2780 8-inch and 12-inch Water Main Replacement on 21st Street from Eureka to Castro Streets and Hill Street from Castro to Church Streets reported 2026-07-17 live