PW USF Complete Streets Improvements

candidate project Design c7e63e38-6823-427f-b28e-e5e354ea545c

The USF Complete Streets Improvements project is a roadway project by San Francisco Public Works to design and build bulb-outs and curb ramps along Golden Gate Avenue next to the University of San Francisco campus. The project is currently active and in the design phase, with construction scheduled to run from August to November 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Anastastia.Haddad@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org”
contact.name Anastastia Haddad reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad”
description Design and construction of bulb-outs and curb ramps adjacent to USF campus. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Design and construction of bulb-outs and curb ramps adjacent to USF campus.”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Golden Gate Ave derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PW USF Complete Streets Improvements reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW USF Complete Streets Improvements”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2026-11-02 reported socrata:btxj-k9uh · retrieved 2026-08-14
“end_date: 2026-11-02T00:00:00.000”
schedule.start 2026-08-12 reported socrata:btxj-k9uh · retrieved 2026-08-14
“start_date: 2026-08-12T00:00:00.000”
source.project_id 63613 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63613”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The USF Complete Streets Improvements project is a roadway project by San Francisco Public Works to design and build... generated llm:summarize · retrieved 2026-08-14
“generated from 13 resolved fields; input sha256-v2=648e36870137a9969ef9bbc2f2cb1693a22e66fe8e4e1f92f2180f5317076e74”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4486833184597, 37.77743289231644]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.44868332, 37.77743289]}]}
2026-08-14 completion date changed immaterial 2026-11-212026-11-02
2026-08-14 start date changed immaterial 2026-08-312026-08-12

Source records

Public Works coordinated projects (DotMaps) key 63613 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The USF Complete Streets Improvements project is a roadway project by San Francisco Public Works to design and build bulb-outs and curb ramps along Golden Gate Avenue next to the University of San Francisco campus. The project is currently active and in the design phase, with construction scheduled to run from August to November 2026. No cost figures have been published. generated 2026-08-14 live
schedule.end 2026-11-02 reported 2026-08-14 live
schedule.start 2026-08-12 reported 2026-08-14 live
summary The USF Complete Streets Improvements is a roadway project by San Francisco Public Works to design and construct bulb-outs and curb ramps along Golden Gate Avenue adjacent to the University of San Francisco campus. The project is currently active and in the design phase, with construction scheduled to run from late August 2026 to late November 2026. No cost figures have been published. generated 2026-07-18 superseded
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Golden Gate Ave derived 2026-07-17 live
schedule.end 2026-11-21 reported 2026-07-17 superseded
schedule.start 2026-08-31 reported 2026-07-17 superseded
source.project_id 63613 reported 2026-07-17 live
contact.email Anastastia.Haddad@sfdpw.org reported 2026-07-17 live
contact.name Anastastia Haddad reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Design and construction of bulb-outs and curb ramps adjacent to USF campus. reported 2026-07-17 live
name PW USF Complete Streets Improvements reported 2026-07-17 live