Various Locations Sewer Replacement No 23
candidate project
Design
b9addecf-b79f-4b64-afb4-4794839c263c
This is a sanitary sewer replacement project in San Francisco, owned by the Department of Public Works' Hydraulic division, covering roughly 18 street segments across the city including sections of Portola Drive, Bryant Street, and South Van Ness Avenue. The project, currently in the design phase, is active and scheduled for construction from October 2026 through September 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2481i, WW-765 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2481i, WW-765” |
| location.geometry | 18 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“18 published segment geometries” |
| location.street_limits | 10th St; 20th St; 30th St; Bryant St; Bryant St from Dore St to 10th St \ Hwy 101 S On Ramp; Burnett Ave; Delta St; Illinois St from 19th St to 20th St; Lapidge St from 18th St to 19th St; Oshaughnessy Blvd; Peninsula Ave from Hester Ave to Blanken Ave; Portola Dr; Portola Dr from Burnett Ave \ Diamond Heights Blvd to Glenview Dr; Portola Dr from Oshaughnessy Blvd \ Woodside Ave to Teresita Blvd; Portola Dr from Teresita Blvd to Fowler Ave \ Sydney Way; South Van Ness Ave from 25th St to 26th St; South Van Ness Ave from Erie St to 14th St; Wilde Ave from Delta St to Ervine St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Various Locations Sewer Replacement No 23 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Sewer Replacement No 23” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-08-11
“facility_type: Sanitary Sewer” |
| schedule.end | 2027-09-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-09-30T00:00:00.000” |
| schedule.start | 2026-10-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-10-01T00:00:00.000” |
| source.project_id | 27422 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 27422” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | This is a sanitary sewer replacement project in San Francisco, owned by the Department of Public Works' Hydraulic... |
generated
llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=1d06678c18004aedb1c77f93e9dedb5f996c2ce9927ccddcbbb2d7865889614e” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-11 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 27422 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 18 geometries | reported | 2026-08-27 | live |
| summary | This is a sanitary sewer replacement project in San Francisco, owned by the Department of Public Works' Hydraulic division, covering roughly 18 street segments across the city including sections of Portola Drive, Bryant Street, and South Van Ness Avenue. The project, currently in the design phase, is active and scheduled for construction from October 2026 through September 2027. No cost figures have been published. | generated | 2026-08-11 | live |
| project_type | Sanitary Sewer | reported | 2026-08-11 | live |
| summary | This is a sewer replacement project owned by San Francisco Public Works (Hydraulic division) that will rehabilitate sanitary sewers along with roadway work at multiple locations across the city, including sites along Portola Drive, Bryant Street, and South Van Ness Avenue, among others. The project is currently active in the design phase, with construction scheduled to run from October 2026 through September 2027. No cost figures have been published. | generated | 2026-07-18 | superseded |
| location.geometry | 18 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 10th St; 20th St; 30th St; Bryant St; Bryant St from Dore St to 10th St \ Hwy 101 S On Ramp; Burnett Ave; Delta St; Illinois St from 19th St to 20th St; Lapidge St from 18th St to 19th St; Oshaughnessy Blvd; Peninsula Ave from Hester Ave to Blanken Ave; Portola Dr; Portola Dr from Burnett Ave \ Diamond Heights Blvd to Glenview Dr; Portola Dr from Oshaughnessy Blvd \ Woodside Ave to Teresita Blvd; Portola Dr from Teresita Blvd to Fowler Ave \ Sydney Way; South Van Ness Ave from 25th St to 26th St; South Van Ness Ave from Erie St to 14th St; Wilde Ave from Delta St to Ervine St | derived | 2026-07-17 | live |
| schedule.end | 2027-09-30 | reported | 2026-07-17 | live |
| schedule.start | 2026-10-01 | reported | 2026-07-17 | live |
| source.project_id | 27422 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer, Roadway | reported | 2026-07-17 | superseded |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2481i, WW-765 | reported | 2026-07-17 | live |
| name | Various Locations Sewer Replacement No 23 | reported | 2026-07-17 | live |