PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe
candidate project
Design
b7c950a6-e485-4d45-a776-2224d69f3755
The PEFWS Pipeline Contract B is a water infrastructure project by the San Francisco Public Utilities Commission's Engineering Management Bureau that will install 36-inch welded steel pipe in the city's Sunset and Parkside areas, running along 36th Avenue, 37th Avenue, Sloat Boulevard, and Wawona Street. The project is currently in the design phase and is active, with work scheduled from April 2024 through March 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC - Engineering Management Bureau |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau” |
| contact.email | azhu@sfwater.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: azhu@sfwater.org” |
| contact.name | Ada Zhu |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ada Zhu” |
| location.geometry | 4 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“4 published segment geometries” |
| location.street_limits | 36TH AVE from WAWONA ST to SLOAT BLVD; 37TH AVE from IRVING ST to WAWONA ST; SLOAT BLVD from 36TH AVE to 22ND AVE; WAWONA ST from 36TH AVE to 37TH AVE |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2028-03-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-03-01T00:00:00.000” |
| schedule.start | 2024-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-04-01T00:00:00.000” |
| source.project_id | 8719 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8719” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The PEFWS Pipeline Contract B is a water infrastructure project by the San Francisco Public Utilities Commission's... |
generated
llm:summarize · retrieved 2026-07-17
“generated from 12 resolved fields; input sha256-v2=facf1b1f4cc0c87588b7647c6200044d7452b19112ab1941d4eac8880ed424ba” |
Source records
| Public Works coordinated projects (DotMaps) | key 8719 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| summary | The PEFWS Pipeline Contract B is a water infrastructure project by the San Francisco Public Utilities Commission's Engineering Management Bureau that will install 36-inch welded steel pipe in the city's Sunset and Parkside areas, running along 36th Avenue, 37th Avenue, Sloat Boulevard, and Wawona Street. The project is currently in the design phase and is active, with work scheduled from April 2024 through March 2028. No cost figures have been published. | generated | 2026-07-17 | live |
| location.geometry | 4 geometries | reported | 2026-07-17 | live |
| location.street_limits | 36TH AVE from WAWONA ST to SLOAT BLVD; 37TH AVE from IRVING ST to WAWONA ST; SLOAT BLVD from 36TH AVE to 22ND AVE; WAWONA ST from 36TH AVE to 37TH AVE | derived | 2026-07-17 | live |
| schedule.end | 2028-03-01 | reported | 2026-07-17 | live |
| schedule.start | 2024-04-01 | reported | 2026-07-17 | live |
| source.project_id | 8719 | reported | 2026-07-17 | live |
| contact.email | azhu@sfwater.org | reported | 2026-07-17 | live |
| contact.name | Ada Zhu | reported | 2026-07-17 | live |
| agency.owner | SF PUC - Engineering Management Bureau | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| name | PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe | reported | 2026-07-17 | live |