sfproj. every fact links to its evidence

← all projects

WD-2940 Kansas and 22nd

candidate project Design b7bb6010-e701-4d01-a6e9-d9bd3f8f027d

This is an active water infrastructure project managed by the San Francisco Public Utilities Commission, involving the replacement of a 2-inch copper water main at 22nd and Kansas streets. The project is currently in the design phase, with construction scheduled to run from January 2026 to January 2028.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
contact.email jcantu@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: jcantu@sfwater.org”
contact.name Jon Cantu reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Jon Cantu”
description 2-Inch Copper Main Replacement on 22nd and Kansas reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2-Inch Copper Main Replacement on 22nd and Kansas”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
name WD-2940 Kansas and 22nd reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2940 Kansas and 22nd”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2028-01-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-01-01T00:00:00.000”
schedule.start 2026-01-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-01-01T00:00:00.000”
source.project_id 53074 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 53074”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is an active water infrastructure project managed by the San Francisco Public Utilities Commission, involving... generated llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=c1951fa28104305ec397ab2cb1ab5c50ec87b56ed41d107f522d185b42ca93f5”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40282826902302, 37.75708440569297]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40282827, 37.75708441]}]}

Source records

Public Works coordinated projects (DotMaps) key 53074 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary This is an active water infrastructure project managed by the San Francisco Public Utilities Commission, involving the replacement of a 2-inch copper water main at 22nd and Kansas streets. The project is currently in the design phase, with construction scheduled to run from January 2026 to January 2028. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
schedule.end 2028-01-01 reported 2026-07-17 live
schedule.start 2026-01-01 reported 2026-07-17 live
source.project_id 53074 reported 2026-07-17 live
contact.email jcantu@sfwater.org reported 2026-07-17 live
contact.name Jon Cantu reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2-Inch Copper Main Replacement on 22nd and Kansas reported 2026-07-17 live
name WD-2940 Kansas and 22nd reported 2026-07-17 live