Various Location Sewer Replacement No 22
candidate project
Design
b69ba127-2c52-410b-a87a-4a896f8b889b
This is a sanitary sewer replacement project owned by San Francisco Public Works (Hydraulic division) that will rebuild aging sewer mains at multiple locations across the city, including segments of 19th Avenue, 7th Avenue, Joost Avenue, and Market Street. The project is currently in the design phase, with construction scheduled to run from August 2026 to August 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| description | 2490i, WW-764 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2490i, WW-764” |
| location.geometry | 16 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“16 published segment geometries” |
| location.street_limits | 07th Ave; 07th Ave from Hugo St to Irving St; 19th Ave; 19th Ave from Banbury Dr to Junipero Serra Blvd; 19th Ave from Crespi Dr to Banbury Dr; 19th Ave from Crespi Dr to Unnamed 106; Acadia St; Beulah St; Clayton St from Waller St to Frederick St; Copper Aly; Joost Ave from Acadia St to Baden St; Joost Ave from Congo St to Detroit St; Kensington Way; Market St from Short St to Copper Aly; Miraloma Dr from Kensington Way \ Portola Dr to Marne Ave |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Various Location Sewer Replacement No 22 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Location Sewer Replacement No 22” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-08-11
“facility_type: Sanitary Sewer” |
| schedule.end | 2027-08-24 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-08-24T00:00:00.000” |
| schedule.start | 2026-08-24 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-08-24T00:00:00.000” |
| source.project_id | 27420 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 27420” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | This is a sanitary sewer replacement project owned by San Francisco Public Works (Hydraulic division) that will... |
generated
llm:summarize · retrieved 2026-08-11
“generated from 13 resolved fields; input sha256-v2=a921aaddb5cc5206b66a6d47334ff753072e01bb1ace1a1853d31cc6f8677bf1” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-11 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 27420 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 16 geometries | reported | 2026-08-27 | live |
| summary | This is a sanitary sewer replacement project owned by San Francisco Public Works (Hydraulic division) that will rebuild aging sewer mains at multiple locations across the city, including segments of 19th Avenue, 7th Avenue, Joost Avenue, and Market Street. The project is currently in the design phase, with construction scheduled to run from August 2026 to August 2027. No cost figures have been published. | generated | 2026-08-11 | live |
| project_type | Sanitary Sewer | reported | 2026-08-11 | live |
| summary | Various Location Sewer Replacement No. 22 is an active sanitary sewer and roadway project managed by San Francisco Public Works (Hydraulic division) that will replace sewer infrastructure at multiple sites across the city, including stretches of 19th Avenue, 7th Avenue, and Market Street. The project is currently in the design phase, with construction scheduled to run from August 2026 to August 2027. No cost figures have been published. | generated | 2026-07-18 | superseded |
| location.geometry | 16 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 07th Ave; 07th Ave from Hugo St to Irving St; 19th Ave; 19th Ave from Banbury Dr to Junipero Serra Blvd; 19th Ave from Crespi Dr to Banbury Dr; 19th Ave from Crespi Dr to Unnamed 106; Acadia St; Beulah St; Clayton St from Waller St to Frederick St; Copper Aly; Joost Ave from Acadia St to Baden St; Joost Ave from Congo St to Detroit St; Kensington Way; Market St from Short St to Copper Aly; Miraloma Dr from Kensington Way \ Portola Dr to Marne Ave | derived | 2026-07-17 | live |
| schedule.end | 2027-08-24 | reported | 2026-07-17 | live |
| schedule.start | 2026-08-24 | reported | 2026-07-17 | live |
| source.project_id | 27420 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer, Roadway | reported | 2026-07-17 | superseded |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 2490i, WW-764 | reported | 2026-07-17 | live |
| name | Various Location Sewer Replacement No 22 | reported | 2026-07-17 | live |