PEFWS Pipeline - 36- & 42-inch Welded Steel Pipe

candidate project Design b443ca63-1d69-4f8b-9913-18b1335f97e8

The PEFWS Pipeline is an SF Public Utilities Commission water project to install 36- and 42-inch welded steel pipe along Lake Merced Boulevard, Middlefield Drive, and Ocean Avenue in southwestern San Francisco. Managed by the PUC's Engineering Management Bureau, the project is currently in the design phase, with work running from April 2024 to a scheduled completion in December 2026. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC - Engineering Management Bureau reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau”
contact.email azhu@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: azhu@sfwater.org”
contact.name Ada Zhu reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ada Zhu”
location.geometry 4 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“4 published segment geometries”
location.street_limits 23RD AVE; LAKE MERCED BLVD from BROTHERHOOD WAY to MIDDLEFIELD DR; MIDDLEFIELD DR from LAKE MERCED BLVD to OCEAN AVE; OCEAN AVE from MIDDLEFIELD DR to 23RD AVE derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PEFWS Pipeline - 36- & 42-inch Welded Steel Pipe reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PEFWS Pipeline - 36- & 42-inch Welded Steel Pipe”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2026-12-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-12-01T00:00:00.000”
schedule.start 2024-04-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-04-01T00:00:00.000”
source.project_id 8718 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8718”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The PEFWS Pipeline is an SF Public Utilities Commission water project to install 36- and 42-inch welded steel pipe... generated llm:summarize · retrieved 2026-07-17
“generated from 12 resolved fields; input sha256-v2=571de1246dc0ce8a3b49029c5cbe05b7772ea2218a96d57bae8c3b00678ad367”

Source records

Public Works coordinated projects (DotMaps) key 8718 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary The PEFWS Pipeline is an SF Public Utilities Commission water project to install 36- and 42-inch welded steel pipe along Lake Merced Boulevard, Middlefield Drive, and Ocean Avenue in southwestern San Francisco. Managed by the PUC's Engineering Management Bureau, the project is currently in the design phase, with work running from April 2024 to a scheduled completion in December 2026. No cost figures have been published. generated 2026-07-17 live
location.geometry 4 geometries reported 2026-07-17 live
location.street_limits 23RD AVE; LAKE MERCED BLVD from BROTHERHOOD WAY to MIDDLEFIELD DR; MIDDLEFIELD DR from LAKE MERCED BLVD to OCEAN AVE; OCEAN AVE from MIDDLEFIELD DR to 23RD AVE derived 2026-07-17 live
schedule.end 2026-12-01 reported 2026-07-17 live
schedule.start 2024-04-01 reported 2026-07-17 live
source.project_id 8718 reported 2026-07-17 live
contact.email azhu@sfwater.org reported 2026-07-17 live
contact.name Ada Zhu reported 2026-07-17 live
agency.owner SF PUC - Engineering Management Bureau reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
name PEFWS Pipeline - 36- & 42-inch Welded Steel Pipe reported 2026-07-17 live