sfproj. every fact links to its evidence

← all projects

Powell Street Improvement Project

candidate project Design b3d9b68d-5ab6-471d-b698-943a730d5a40

The Powell Street Improvement Project is a streetscape project led by San Francisco Public Works along Powell Street between Eddy and Geary streets. The work includes sidewalk widening, bulbouts, landscaping, roadway replacement, lighting, and wayfinding. The project is currently in the design phase, with construction scheduled to run from December 2027 to November 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Michelle.Woo@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Michelle.Woo@sfdpw.org”
contact.name Michelle Woo reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Michelle Woo”
description Streetscape project including sidewalk widening, bulbouts, bulbouts, landscaping, roadway replacement, landscaping, lighting, wayfinding, etc. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Streetscape project including sidewalk widening, bulbouts, bulbouts, landscaping, roadway replacement, landscaping, lighting, wayfinding, etc.”
location.geometry 3 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“3 published segment geometries”
location.street_limits Powell St from Eddy St to Ellis St; Powell St from Ellis St to Ofarrell St; Powell St from Ofarrell St to Geary St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Powell Street Improvement Project reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Powell Street Improvement Project”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Land reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Land”
schedule.end 2028-11-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-11-30T00:00:00.000”
schedule.start 2027-12-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-12-01T00:00:00.000”
source.project_id 63612 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63612”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Powell Street Improvement Project is a streetscape project led by San Francisco Public Works along Powell Street... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=cce650d33b806fcff3796796fe7fedf148b6e456b39194a84e83e68aaeee7d8b”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.40769847111878, 37.7846986115315], [-122.40785251984423, 37.78549156035168]]}, {'type': 'LineString', 'coordinates': [[-122.40785251984423, 37.78549156035168], [-122.40803623664033, 37.78640961352967]]}, {'type': 'LineString', 'coordinates': [[-122.40803623664033, 37.78640961352967], [-122.4082267256596, 37.787359262240756]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.40769847, 37.78469861], [-122.40785252, 37.78549156]]}, {'type': 'LineString', 'coordinates': [[-122.40785252, 37.78549156], [-122.40803624, 37.78640961]]}, {'type': 'LineString', 'coordinates': [[-122.40803624, 37.78640961], [-122.40822673, 37.78735926]]}]}

Source records

Public Works coordinated projects (DotMaps) key 63612 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 3 geometries reported 2026-08-27 live
summary The Powell Street Improvement Project is a streetscape project led by San Francisco Public Works along Powell Street between Eddy and Geary streets. The work includes sidewalk widening, bulbouts, landscaping, roadway replacement, lighting, and wayfinding. The project is currently in the design phase, with construction scheduled to run from December 2027 to November 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 3 geometries reported 2026-07-17 superseded
location.street_limits Powell St from Eddy St to Ellis St; Powell St from Ellis St to Ofarrell St; Powell St from Ofarrell St to Geary St derived 2026-07-17 live
schedule.end 2028-11-30 reported 2026-07-17 live
schedule.start 2027-12-01 reported 2026-07-17 live
source.project_id 63612 reported 2026-07-17 live
contact.email Michelle.Woo@sfdpw.org reported 2026-07-17 live
contact.name Michelle Woo reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Land reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Streetscape project including sidewalk widening, bulbouts, bulbouts, landscaping, roadway replacement, landscaping, lighting, wayfinding, etc. reported 2026-07-17 live
name Powell Street Improvement Project reported 2026-07-17 live