WD-2708: Geary Street Phase 2

candidate project Construction b3a212b7-ed16-46ed-9686-fb5c2df83709

The WD-2708: Geary Street Phase 2 project is an active water infrastructure project owned by the SF PUC Water, covering Geary Boulevard from 34th Avenue to Stanyan Street. The project is currently in construction, which began in April 2024 and is scheduled to be completed by December 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description Geary Street from 34th Ave to Stanyan St reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Geary Street from 34th Ave to Stanyan St”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“1 published segment geometries”
location.street_limits GEARY BLVD from 34TH AVE to STANYAN ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name WD-2708: Geary Street Phase 2 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2708: Geary Street Phase 2”
phase Construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2027-12-27 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-27T00:00:00.000”
schedule.start 2024-04-11 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-04-11T00:00:00.000”
source.project_id 9105 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9105”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The WD-2708: Geary Street Phase 2 project is an active water infrastructure project owned by the SF PUC Water,... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=f7bbb82c5b1f5f6cc3de7ea6ecd514e25237a33d9a4d9e00c75a42cadd6b25a9”

Source records

Public Works coordinated projects (DotMaps) key 9105 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary The WD-2708: Geary Street Phase 2 project is an active water infrastructure project owned by the SF PUC Water, covering Geary Boulevard from 34th Avenue to Stanyan Street. The project is currently in construction, which began in April 2024 and is scheduled to be completed by December 2027. No cost figures have been published. generated 2026-07-17 live
location.geometry 1 geometries reported 2026-07-17 live
location.street_limits GEARY BLVD from 34TH AVE to STANYAN ST derived 2026-07-17 live
schedule.end 2027-12-27 reported 2026-07-17 live
schedule.start 2024-04-11 reported 2026-07-17 live
source.project_id 9105 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Construction reported 2026-07-17 live
status Active reported 2026-07-17 live
description Geary Street from 34th Ave to Stanyan St reported 2026-07-17 live
name WD-2708: Geary Street Phase 2 reported 2026-07-17 live