PW VL Cr and Sub-Sdwlk Bsmnt No 3
candidate project
Design
b26c952b-5cab-4fdd-a041-2e29be68c7c5
The PW VL Cr and Sub-Sdwlk Bsmnt No 3 is an annual curb ramp program run by San Francisco Public Works to plan, design, and build curb ramps at various locations across the city, including spots with sub-sidewalk basements. Work is spread across several downtown corridors, including Battery, Geary, and Kearny streets. The project is currently in the design phase, with construction scheduled to run from November 2026 to November 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Streets & Highways |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways” |
| contact.email | Anastastia.Haddad@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org” |
| contact.name | Anastastia Haddad |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad” |
| description | Annual program to plan, design, and construct curb ramps at various locations throughout the city as well as at locations with sub-sidewalk base. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Annual program to plan, design, and construct curb ramps at various locations throughout the city as well as at locations with sub-sidewalk base.” |
| location.geometry | 6 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“6 published segment geometries” |
| location.street_limits | Battery St; Geary St; Jones St; Kearny St; Larkin St; Polk St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PW VL Cr and Sub-Sdwlk Bsmnt No 3 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW VL Cr and Sub-Sdwlk Bsmnt No 3” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2027-11-11 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-11-11T00:00:00.000” |
| schedule.start | 2026-11-17 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-11-17T00:00:00.000” |
| source.project_id | 23514 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 23514” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The PW VL Cr and Sub-Sdwlk Bsmnt No 3 is an annual curb ramp program run by San Francisco Public Works to plan,... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=0366373ba928b930a2f6068c2824e720b4d3b3d948a70667e985aaf0c4f5e09a” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 23514 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 6 geometries | reported | 2026-08-27 | live |
| summary | The PW VL Cr and Sub-Sdwlk Bsmnt No 3 is an annual curb ramp program run by San Francisco Public Works to plan, design, and build curb ramps at various locations across the city, including spots with sub-sidewalk basements. Work is spread across several downtown corridors, including Battery, Geary, and Kearny streets. The project is currently in the design phase, with construction scheduled to run from November 2026 to November 2027. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 6 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Battery St; Geary St; Jones St; Kearny St; Larkin St; Polk St | derived | 2026-07-17 | live |
| schedule.end | 2027-11-11 | reported | 2026-07-17 | live |
| schedule.start | 2026-11-17 | reported | 2026-07-17 | live |
| source.project_id | 23514 | reported | 2026-07-17 | live |
| contact.email | Anastastia.Haddad@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Anastastia Haddad | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Streets & Highways | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Annual program to plan, design, and construct curb ramps at various locations throughout the city as well as at locations with sub-sidewalk base. | reported | 2026-07-17 | live |
| name | PW VL Cr and Sub-Sdwlk Bsmnt No 3 | reported | 2026-07-17 | live |