PW VL Cr and Sub-Sdwlk Bsmnt No 3

candidate project Design b26c952b-5cab-4fdd-a041-2e29be68c7c5

The PW VL Cr and Sub-Sdwlk Bsmnt No 3 is an annual curb ramp program run by San Francisco Public Works to plan, design, and build curb ramps at various locations across the city, including spots with sub-sidewalk basements. Work is spread across several downtown corridors, including Battery, Geary, and Kearny streets. The project is currently in the design phase, with construction scheduled to run from November 2026 to November 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Anastastia.Haddad@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org”
contact.name Anastastia Haddad reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad”
description Annual program to plan, design, and construct curb ramps at various locations throughout the city as well as at locations with sub-sidewalk base. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Annual program to plan, design, and construct curb ramps at various locations throughout the city as well as at locations with sub-sidewalk base.”
location.geometry 6 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“6 published segment geometries”
location.street_limits Battery St; Geary St; Jones St; Kearny St; Larkin St; Polk St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PW VL Cr and Sub-Sdwlk Bsmnt No 3 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW VL Cr and Sub-Sdwlk Bsmnt No 3”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2027-11-11 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-11-11T00:00:00.000”
schedule.start 2026-11-17 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-11-17T00:00:00.000”
source.project_id 23514 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 23514”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The PW VL Cr and Sub-Sdwlk Bsmnt No 3 is an annual curb ramp program run by San Francisco Public Works to plan,... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=0366373ba928b930a2f6068c2824e720b4d3b3d948a70667e985aaf0c4f5e09a”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40068133705653, 37.79677684320204]}, {'type': 'Point', 'coordinates': [-122.40421983524448, 37.791690583921095]}, {'type': 'Point', 'coordinates': [-122.41296966662526, 37.78578958446499]}, {'type': 'Point', 'coordinates': [-122.41480664829902, 37.78651981959045]}, {'type': 'Point', 'coordinates': [-122.41899327298353, 37.78216926993749]}, {'type': 'Point', 'coordinates': [-122.41846502669458, 37.787966286052054]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40068134, 37.79677684]}, {'type': 'Point', 'coordinates': [-122.40421984, 37.79169058]}, {'type': 'Point', 'coordinates': [-122.41296967, 37.78578958]}, {'type': 'Point', 'coordinates': [-122.41480665, 37.78651982]}, {'type': 'Point', 'coordinates': [-122.41899327, 37.78216927]}, {'type': 'Point', 'coordinates': [-122.41846503, 37.78796629]}]}

Source records

Public Works coordinated projects (DotMaps) key 23514 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 6 geometries reported 2026-08-27 live
summary The PW VL Cr and Sub-Sdwlk Bsmnt No 3 is an annual curb ramp program run by San Francisco Public Works to plan, design, and build curb ramps at various locations across the city, including spots with sub-sidewalk basements. Work is spread across several downtown corridors, including Battery, Geary, and Kearny streets. The project is currently in the design phase, with construction scheduled to run from November 2026 to November 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 6 geometries reported 2026-07-17 superseded
location.street_limits Battery St; Geary St; Jones St; Kearny St; Larkin St; Polk St derived 2026-07-17 live
schedule.end 2027-11-11 reported 2026-07-17 live
schedule.start 2026-11-17 reported 2026-07-17 live
source.project_id 23514 reported 2026-07-17 live
contact.email Anastastia.Haddad@sfdpw.org reported 2026-07-17 live
contact.name Anastastia Haddad reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Annual program to plan, design, and construct curb ramps at various locations throughout the city as well as at locations with sub-sidewalk base. reported 2026-07-17 live
name PW VL Cr and Sub-Sdwlk Bsmnt No 3 reported 2026-07-17 live