WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets
candidate project
Design
b2417d96-2e84-4d9f-92cd-71e282179da2
This is a San Francisco Public Utilities Commission water project to replace aging 8- and 12-inch ductile iron water mains along 18th and Mariposa Streets from Potrero Avenue to Texas Street, plus various side streets in the Potrero Hill area. The project (WD-2919) is currently in the design phase, with construction scheduled to run from April 2026 to December 2027. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St” |
| location.geometry | 18 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“18 published segment geometries” |
| location.street_limits | 18TH ST from HAMPSHIRE ST to UTAH ST; 18TH ST from SAN BRUNO AVE to TEXAS ST; 19TH ST; ARKANSAS ST; CAROLINA ST; DE HARO ST; KANSAS ST; KANSAS ST from 17TH ST to MARIPOSA ST; MARIPOSA ST; MISSOURI ST; RHODE ISLAND ST; SAN BRUNO AVE; TEXAS ST; UTAH ST; VERMONT ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2027-12-09 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-09T00:00:00.000” |
| schedule.start | 2026-04-13 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-04-13T00:00:00.000” |
| source.project_id | 9103 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9103” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | This is a San Francisco Public Utilities Commission water project to replace aging 8- and 12-inch ductile iron water... |
generated
llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=d3bb7c6e0bd3a9f5e8ec6a0849466ac36708f9a8bc9751550064a593ae42567b” |
Source records
| Public Works coordinated projects (DotMaps) | key 9103 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| summary | This is a San Francisco Public Utilities Commission water project to replace aging 8- and 12-inch ductile iron water mains along 18th and Mariposa Streets from Potrero Avenue to Texas Street, plus various side streets in the Potrero Hill area. The project (WD-2919) is currently in the design phase, with construction scheduled to run from April 2026 to December 2027. No cost figures have been published. | generated | 2026-07-17 | live |
| location.geometry | 18 geometries | reported | 2026-07-17 | live |
| location.street_limits | 18TH ST from HAMPSHIRE ST to UTAH ST; 18TH ST from SAN BRUNO AVE to TEXAS ST; 19TH ST; ARKANSAS ST; CAROLINA ST; DE HARO ST; KANSAS ST; KANSAS ST from 17TH ST to MARIPOSA ST; MARIPOSA ST; MISSOURI ST; RHODE ISLAND ST; SAN BRUNO AVE; TEXAS ST; UTAH ST; VERMONT ST | derived | 2026-07-17 | live |
| schedule.end | 2027-12-09 | reported | 2026-07-17 | live |
| schedule.start | 2026-04-13 | reported | 2026-07-17 | live |
| source.project_id | 9103 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | 8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St | reported | 2026-07-17 | live |
| name | WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets | reported | 2026-07-17 | live |