sfproj. every fact links to its evidence

← all projects

WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets

candidate project Design b2417d96-2e84-4d9f-92cd-71e282179da2

This is a San Francisco Public Utilities Commission water project to replace aging 8- and 12-inch ductile iron water mains along 18th and Mariposa Streets from Potrero Avenue to Texas Street, plus various side streets in the Potrero Hill area. The project (WD-2919) is currently in the design phase, with construction scheduled to run from April 2026 to December 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description 8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St”
location.geometry 18 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“18 published segment geometries”
location.street_limits 18TH ST from HAMPSHIRE ST to UTAH ST; 18TH ST from SAN BRUNO AVE to TEXAS ST; 19TH ST; ARKANSAS ST; CAROLINA ST; DE HARO ST; KANSAS ST; KANSAS ST from 17TH ST to MARIPOSA ST; MARIPOSA ST; MISSOURI ST; RHODE ISLAND ST; SAN BRUNO AVE; TEXAS ST; UTAH ST; VERMONT ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2027-12-09 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-12-09T00:00:00.000”
schedule.start 2026-04-13 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-04-13T00:00:00.000”
source.project_id 9103 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9103”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is a San Francisco Public Utilities Commission water project to replace aging 8- and 12-inch ductile iron water... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=d3bb7c6e0bd3a9f5e8ec6a0849466ac36708f9a8bc9751550064a593ae42567b”

Source records

Public Works coordinated projects (DotMaps) key 9103 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a San Francisco Public Utilities Commission water project to replace aging 8- and 12-inch ductile iron water mains along 18th and Mariposa Streets from Potrero Avenue to Texas Street, plus various side streets in the Potrero Hill area. The project (WD-2919) is currently in the design phase, with construction scheduled to run from April 2026 to December 2027. No cost figures have been published. generated 2026-07-17 live
location.geometry 18 geometries reported 2026-07-17 live
location.street_limits 18TH ST from HAMPSHIRE ST to UTAH ST; 18TH ST from SAN BRUNO AVE to TEXAS ST; 19TH ST; ARKANSAS ST; CAROLINA ST; DE HARO ST; KANSAS ST; KANSAS ST from 17TH ST to MARIPOSA ST; MARIPOSA ST; MISSOURI ST; RHODE ISLAND ST; SAN BRUNO AVE; TEXAS ST; UTAH ST; VERMONT ST derived 2026-07-17 live
schedule.end 2027-12-09 reported 2026-07-17 live
schedule.start 2026-04-13 reported 2026-07-17 live
source.project_id 9103 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St reported 2026-07-17 live
name WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets reported 2026-07-17 live