PW Various Locations Sewer Replacement (JV VL PR No 71)
candidate project
Construction
af4905e7-72e9-44c6-8b46-c93a9171e0e6
This is a sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic Division) at various locations in the city's northeast, including stretches of Chestnut, Davis, and Washington streets. The active project is in the construction phase, which began in March 2025 and is scheduled to conclude in September 2026. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Hydraulic |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic” |
| contact.email | Lesley.Wong@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org” |
| contact.name | Lesley Wong |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong” |
| location.geometry | 15 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“15 published segment geometries” |
| location.street_limits | Chestnut St; Chestnut St from Columbus Ave \ Taylor St to Jones St; Davis St; Davis St from California St to Sacramento St; Drumm St; Eastman St; Francisco St; Grant Ave from Vinton Ct to California St; Halleck St; Leidesdorff St from California St to Halleck St; North Point St; North Point St from Powell St to Mason St; Russell St from Hyde St to Eastman St; Washington St from Davis St to Battery St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PW Various Locations Sewer Replacement (JV VL PR No 71) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW Various Locations Sewer Replacement (JV VL PR No 71)” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Construction” |
| project_type | Sanitary Sewer |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer” |
| schedule.end | 2026-09-06 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2026-09-06T00:00:00.000” |
| schedule.start | 2025-03-03 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-03-03T00:00:00.000” |
| source.project_id | 31439 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31439” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | This is a sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic Division) at various... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=48d549555e2313ffffc4f4ceeca2d47d4e5f5c69f23ee862756af70eea02ad59” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 31439 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 15 geometries | reported | 2026-08-27 | live |
| summary | This is a sanitary sewer replacement project managed by San Francisco Public Works (Hydraulic Division) at various locations in the city's northeast, including stretches of Chestnut, Davis, and Washington streets. The active project is in the construction phase, which began in March 2025 and is scheduled to conclude in September 2026. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 15 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Chestnut St; Chestnut St from Columbus Ave \ Taylor St to Jones St; Davis St; Davis St from California St to Sacramento St; Drumm St; Eastman St; Francisco St; Grant Ave from Vinton Ct to California St; Halleck St; Leidesdorff St from California St to Halleck St; North Point St; North Point St from Powell St to Mason St; Russell St from Hyde St to Eastman St; Washington St from Davis St to Battery St | derived | 2026-07-17 | live |
| schedule.end | 2026-09-06 | reported | 2026-07-17 | live |
| schedule.start | 2025-03-03 | reported | 2026-07-17 | live |
| source.project_id | 31439 | reported | 2026-07-17 | live |
| contact.email | Lesley.Wong@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Lesley Wong | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Hydraulic | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer | reported | 2026-07-17 | live |
| phase | Construction | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| name | PW Various Locations Sewer Replacement (JV VL PR No 71) | reported | 2026-07-17 | live |