Various Locations Pavement Renovation No 90

candidate project Design a53597b5-8c2b-41ec-b670-971d2c80fe69

Various Locations Pavement Renovation No. 90 is a roadway repaving project led by San Francisco Public Works (Streets & Highways division) that will resurface streets at numerous locations across the city, including stretches of 7th, 14th, and 15th Avenues in the Sunset area, spanning 62 street segments in all. The project is currently in the design phase, with construction scheduled to run from March 2026 to May 2027.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Therese.Topacio@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Therese.Topacio@sfdpw.org”
contact.name Therese Topacio reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Therese Topacio”
location.geometry 62 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“62 published segment geometries”
location.street_limits 07th Ave; 07th Ave from Lawton St \ Warren Dr to Moraga St; 07th Ave from Moraga St to Laguna Honda Blvd \ Noriega St; 14th Ave; 14th Ave from 15th Ave \ Aloha Ave to Encinal Walk; 14th Ave from Aerial Way to Radio Ter; 14th Ave from Encinal Walk to Noriega St; 14th Ave from Ortega Way \ Pacheco St to Aerial Way; 14th Ave from Ortega Way \ Pacheco St to Radio Ter; 15th Ave; 15th Ave from 14th Ave \ Aloha Ave to Encinal Walk; 15th Ave from 14th Ave \ Aloha Ave to Moraga St; 15th Ave from Encinal Walk to Crestwell Walk \ Noriega St; 23rd St from Diamond St to Eureka St; Aerial Way; Aerial Way from Pacheco St to Funston Ave; Capitol Ave from De Montfort Ave to Ocean Ave; Clarendon Ave; Corbett Ave from Danvers St to Mars St; Dewey Blvd … derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Various Locations Pavement Renovation No 90 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Pavement Renovation No 90”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2027-05-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-05-30T00:00:00.000”
schedule.start 2026-03-17 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-03-17T00:00:00.000”
source.project_id 8985 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 8985”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary Various Locations Pavement Renovation No. 90 is a roadway repaving project led by San Francisco Public Works... generated llm:summarize · retrieved 2026-07-17
“generated from 12 resolved fields; input sha256-v2=9fc47a3f26a3570446cc51a5c5c07ee0c6d39c066f3ca40a0a31d2f5d84c34cb”

Source records

Public Works coordinated projects (DotMaps) key 8985 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary Various Locations Pavement Renovation No. 90 is a roadway repaving project led by San Francisco Public Works (Streets & Highways division) that will resurface streets at numerous locations across the city, including stretches of 7th, 14th, and 15th Avenues in the Sunset area, spanning 62 street segments in all. The project is currently in the design phase, with construction scheduled to run from March 2026 to May 2027. generated 2026-07-17 live
location.geometry 62 geometries reported 2026-07-17 live
location.street_limits 07th Ave; 07th Ave from Lawton St \ Warren Dr to Moraga St; 07th Ave from Moraga St to Laguna Honda Blvd \ Noriega St; 14th Ave; 14th Ave from 15th Ave \ Aloha Ave to Encinal Walk; 14th Ave from Aerial Way to Radio Ter; 14th Ave from Encinal Walk to Noriega St; 14th Ave from Ortega Way \ Pacheco St to Aerial Way; 14th Ave from Ortega Way \ Pacheco St to Radio Ter; 15th Ave; 15th Ave from 14th Ave \ Aloha Ave to Encinal Walk; 15th Ave from 14th Ave \ Aloha Ave to Moraga St; 15th Ave from Encinal Walk to Crestwell Walk \ Noriega St; 23rd St from Diamond St to Eureka St; Aerial Way; Aerial Way from Pacheco St to Funston Ave; Capitol Ave from De Montfort Ave to Ocean Ave; Clarendon Ave; Corbett Ave from Danvers St to Mars St; Dewey Blvd … derived 2026-07-17 live
schedule.end 2027-05-30 reported 2026-07-17 live
schedule.start 2026-03-17 reported 2026-07-17 live
source.project_id 8985 reported 2026-07-17 live
contact.email Therese.Topacio@sfdpw.org reported 2026-07-17 live
contact.name Therese Topacio reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
name Various Locations Pavement Renovation No 90 reported 2026-07-17 live