PW VL Cr and Sub-Sdwlk Bsmnt No 4
candidate project
Design
a4f55633-78e3-4fc1-8c3b-e0f62adc3f80
The PW VL Cr and Sub-Sidewalk Basement No. 4 project is an annual program by San Francisco Public Works to plan, design, and construct curb ramps at various locations throughout the city, including sites with sub-sidewalk basements. Owned by DPW's Streets & Highways division, the roadway project spans several downtown corridors including Bush, California, and Geary streets. It is currently active and in the design phase, with construction scheduled to run from May 2028 to July 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Streets & Highways |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways” |
| contact.email | Anastastia.Haddad@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org” |
| contact.name | Anastastia Haddad |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad” |
| description | Annual program to plan, design and construct curb ramps at various locations throughout the City that includes non sub-sidewalk basements and sub-sidewalk basements. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Annual program to plan, design and construct curb ramps at various locations throughout the City that includes non sub-sidewalk basements and...” |
| location.geometry | 6 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“6 published segment geometries” |
| location.street_limits | Bush St; California St; Clay St; Eddy St; Geary St; Powell St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PW VL Cr and Sub-Sdwlk Bsmnt No 4 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW VL Cr and Sub-Sdwlk Bsmnt No 4” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2029-07-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-07-01T00:00:00.000” |
| schedule.start | 2028-05-24 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-05-24T00:00:00.000” |
| source.project_id | 52908 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 52908” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The PW VL Cr and Sub-Sidewalk Basement No. 4 project is an annual program by San Francisco Public Works to plan,... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=ac9b731837dafe89a0788cd4d01db52dc8dd204d608bfa22f34903f93fb38030” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 52908 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 6 geometries | reported | 2026-08-27 | live |
| summary | The PW VL Cr and Sub-Sidewalk Basement No. 4 project is an annual program by San Francisco Public Works to plan, design, and construct curb ramps at various locations throughout the city, including sites with sub-sidewalk basements. Owned by DPW's Streets & Highways division, the roadway project spans several downtown corridors including Bush, California, and Geary streets. It is currently active and in the design phase, with construction scheduled to run from May 2028 to July 2029. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 6 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Bush St; California St; Clay St; Eddy St; Geary St; Powell St | derived | 2026-07-17 | live |
| schedule.end | 2029-07-01 | reported | 2026-07-17 | live |
| schedule.start | 2028-05-24 | reported | 2026-07-17 | live |
| source.project_id | 52908 | reported | 2026-07-17 | live |
| contact.email | Anastastia.Haddad@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Anastastia Haddad | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Streets & Highways | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Annual program to plan, design and construct curb ramps at various locations throughout the City that includes non sub-sidewalk basements and sub-sidewalk basements. | reported | 2026-07-17 | live |
| name | PW VL Cr and Sub-Sdwlk Bsmnt No 4 | reported | 2026-07-17 | live |