PW VL Cr and Sub-Sdwlk Bsmnt No 4

candidate project Design a4f55633-78e3-4fc1-8c3b-e0f62adc3f80

The PW VL Cr and Sub-Sidewalk Basement No. 4 project is an annual program by San Francisco Public Works to plan, design, and construct curb ramps at various locations throughout the city, including sites with sub-sidewalk basements. Owned by DPW's Streets & Highways division, the roadway project spans several downtown corridors including Bush, California, and Geary streets. It is currently active and in the design phase, with construction scheduled to run from May 2028 to July 2029. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Streets & Highways reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways”
contact.email Anastastia.Haddad@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org”
contact.name Anastastia Haddad reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad”
description Annual program to plan, design and construct curb ramps at various locations throughout the City that includes non sub-sidewalk basements and sub-sidewalk basements. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Annual program to plan, design and construct curb ramps at various locations throughout the City that includes non sub-sidewalk basements and...”
location.geometry 6 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“6 published segment geometries”
location.street_limits Bush St; California St; Clay St; Eddy St; Geary St; Powell St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name PW VL Cr and Sub-Sdwlk Bsmnt No 4 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: PW VL Cr and Sub-Sdwlk Bsmnt No 4”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2029-07-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-07-01T00:00:00.000”
schedule.start 2028-05-24 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-05-24T00:00:00.000”
source.project_id 52908 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 52908”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The PW VL Cr and Sub-Sidewalk Basement No. 4 project is an annual program by San Francisco Public Works to plan,... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=ac9b731837dafe89a0788cd4d01db52dc8dd204d608bfa22f34903f93fb38030”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4034917749765, 37.78796309122612]}, {'type': 'Point', 'coordinates': [-122.4027667696255, 37.79285122190513]}, {'type': 'Point', 'coordinates': [-122.4055737456041, 37.79056523775157]}, {'type': 'Point', 'coordinates': [-122.40313929487863, 37.79466628174646]}, {'type': 'Point', 'coordinates': [-122.40930918010993, 37.784349269129706]}, {'type': 'Point', 'coordinates': [-122.40859504518608, 37.78922561480497]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40349177, 37.78796309]}, {'type': 'Point', 'coordinates': [-122.40276677, 37.79285122]}, {'type': 'Point', 'coordinates': [-122.40557375, 37.79056524]}, {'type': 'Point', 'coordinates': [-122.40313929, 37.79466628]}, {'type': 'Point', 'coordinates': [-122.40930918, 37.78434927]}, {'type': 'Point', 'coordinates': [-122.40859505, 37.78922561]}]}

Source records

Public Works coordinated projects (DotMaps) key 52908 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 6 geometries reported 2026-08-27 live
summary The PW VL Cr and Sub-Sidewalk Basement No. 4 project is an annual program by San Francisco Public Works to plan, design, and construct curb ramps at various locations throughout the city, including sites with sub-sidewalk basements. Owned by DPW's Streets & Highways division, the roadway project spans several downtown corridors including Bush, California, and Geary streets. It is currently active and in the design phase, with construction scheduled to run from May 2028 to July 2029. No cost figures have been published. generated 2026-07-18 live
location.geometry 6 geometries reported 2026-07-17 superseded
location.street_limits Bush St; California St; Clay St; Eddy St; Geary St; Powell St derived 2026-07-17 live
schedule.end 2029-07-01 reported 2026-07-17 live
schedule.start 2028-05-24 reported 2026-07-17 live
source.project_id 52908 reported 2026-07-17 live
contact.email Anastastia.Haddad@sfdpw.org reported 2026-07-17 live
contact.name Anastastia Haddad reported 2026-07-17 live
agency.owner SF DPW IDC - Streets & Highways reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Annual program to plan, design and construct curb ramps at various locations throughout the City that includes non sub-sidewalk basements and sub-sidewalk basements. reported 2026-07-17 live
name PW VL Cr and Sub-Sdwlk Bsmnt No 4 reported 2026-07-17 live