Ocean Beach Climate Adaptation Project
candidate project
Design
a27c15b9-8407-4628-83bc-1420c14b09bc
The Ocean Beach Climate Adaptation Project is an active roadway project led by San Francisco Public Works (IDC Project Management) along the Great Highway from Sloat Boulevard to Skyline Boulevard. The project is currently in the design phase. No cost figures or schedule dates have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Project Management |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Project Management” |
| contact.email | Edmund.Lee@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Edmund.Lee@sfdpw.org” |
| contact.name | Edmund Lee |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Edmund Lee” |
| location.geometry | 5 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“5 published segment geometries” |
| location.street_limits | Great Hwy; Great Hwy from Sloat Blvd to Skyline Blvd |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Ocean Beach Climate Adaptation Project |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Ocean Beach Climate Adaptation Project” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| source.project_id | 63607 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63607” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Ocean Beach Climate Adaptation Project is an active roadway project led by San Francisco Public Works (IDC... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 10 resolved fields; input sha256-v2=2221d25d6b9bfb96bd6fb5bb66b3350f3952aab9850bd039534f94287043cdaa” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 63607 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 5 geometries | reported | 2026-08-27 | live |
| summary | The Ocean Beach Climate Adaptation Project is an active roadway project led by San Francisco Public Works (IDC Project Management) along the Great Highway from Sloat Boulevard to Skyline Boulevard. The project is currently in the design phase. No cost figures or schedule dates have been published. | generated | 2026-07-18 | live |
| location.geometry | 5 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Great Hwy; Great Hwy from Sloat Blvd to Skyline Blvd | derived | 2026-07-17 | live |
| source.project_id | 63607 | reported | 2026-07-17 | live |
| contact.email | Edmund.Lee@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Edmund Lee | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Project Management | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| name | Ocean Beach Climate Adaptation Project | reported | 2026-07-17 | live |