Various Locations Sewer Replacement No 38

candidate project Planning Pre-Planning a0a6aab7-df24-459d-b2f0-cccb76babe0a

This is a sanitary sewer replacement project in San Francisco, known as Various Locations Sewer Replacement No. 38, owned by SF Public Works (Hydraulic Division). It involves replacing sewer infrastructure across roughly 45 street segments in the city's southwest, including stretches of 19th Avenue, Junipero Serra Boulevard, and Font Boulevard. The project is in pre-planning, with construction scheduled to run from April 2028 to November 2029. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner
stale
SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email
stale
Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name
stale
Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description
stale
2691i reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2691i”
location.geometry
stale
45 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“45 published segment geometries”
location.street_limits
stale
19th Ave; 19th Ave from Crespi Dr to Banbury Dr; Arballo Dr; Brighton Ave; Brighton Ave from Lakeview Ave to Grafton Ave; Broadmoor Dr; Buckingham Way from 19th Ave to Winston Dr; Capitol Ave; Capitol Ave from Farallones St to Lobos St; El Plazuela Way; Estero Ave; Everglade Dr; Font Blvd; Font Blvd from Arballo Dr \ Tapia Dr to Lake Merced Blvd; Gellert Dr from Everglade Dr to Middlefield Dr; Grafton Ave; Josiah Ave; Jules Ave from Grafton Ave to Holloway Ave; Junipero Serra Blvd; Junipero Serra Blvd from El Plazuela Way to Mercedes Way … derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name
stale
Various Locations Sewer Replacement No 38 reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Sewer Replacement No 38”
phase
stale
Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type
stale
Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end
stale
2029-11-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-11-30T00:00:00.000”
schedule.start
stale
2028-04-28 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-04-28T00:00:00.000”
source.project_id
stale
62220 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 62220”
status
stale
Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a sanitary sewer replacement project in San Francisco, known as Various Locations Sewer Replacement No. 38,... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=e1f784952e9d9aca63f1f1893987d4115e702839a8cb617a9033fe4beb395313”

Source records

Public Works coordinated projects (DotMaps) key 62220 vanished from source 2026-08-26 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a sanitary sewer replacement project in San Francisco, known as Various Locations Sewer Replacement No. 38, owned by SF Public Works (Hydraulic Division). It involves replacing sewer infrastructure across roughly 45 street segments in the city's southwest, including stretches of 19th Avenue, Junipero Serra Boulevard, and Font Boulevard. The project is in pre-planning, with construction scheduled to run from April 2028 to November 2029. No cost figures have been published. generated 2026-07-18 live
location.geometry 45 geometries reported 2026-07-17 live
location.street_limits 19th Ave; 19th Ave from Crespi Dr to Banbury Dr; Arballo Dr; Brighton Ave; Brighton Ave from Lakeview Ave to Grafton Ave; Broadmoor Dr; Buckingham Way from 19th Ave to Winston Dr; Capitol Ave; Capitol Ave from Farallones St to Lobos St; El Plazuela Way; Estero Ave; Everglade Dr; Font Blvd; Font Blvd from Arballo Dr \ Tapia Dr to Lake Merced Blvd; Gellert Dr from Everglade Dr to Middlefield Dr; Grafton Ave; Josiah Ave; Jules Ave from Grafton Ave to Holloway Ave; Junipero Serra Blvd; Junipero Serra Blvd from El Plazuela Way to Mercedes Way … derived 2026-07-17 live
schedule.end 2029-11-30 reported 2026-07-17 live
schedule.start 2028-04-28 reported 2026-07-17 live
source.project_id 62220 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 2691i reported 2026-07-17 live
name Various Locations Sewer Replacement No 38 reported 2026-07-17 live