Hallidie Plaza Accessibility Improvements

candidate project Design 9ec2464c-099b-41e7-8f8f-15ff8b1918bc

The Hallidie Plaza Accessibility Improvements is an active roadway and accessibility project in downtown San Francisco, near Cyril Magnin Street and the Powell Street BART/Muni station. Led by San Francisco Public Works' Bureau of Design and Construction, the project will remove the existing Market Street elevator and build a large pedestrian ramp connecting the street level to the plaza level, along with a smaller ramp linking the plaza level to the BART and Muni entrance. The project is currently in the design phase, with construction scheduled to run from April 2027 through June 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW BDC - Landscape Architecture reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW BDC - Landscape Architecture”
contact.email Anastastia.Haddad@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org”
contact.name Anastastia Haddad reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad”
description Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary, smaller ramp connecting Plaza Level to Powell Bart Station/Muni entrance. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary,...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Cyril Magnin St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Hallidie Plaza Accessibility Improvements reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Hallidie Plaza Accessibility Improvements”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2028-06-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-06-30T00:00:00.000”
schedule.start 2027-04-19 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-04-19T00:00:00.000”
source.project_id 63611 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63611”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Hallidie Plaza Accessibility Improvements is an active roadway and accessibility project in downtown San... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=338950d356bbc7585210fbb0e80bbe4210dc5fb440492c4cb91d4d391494b9ac”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40849315817437, 37.78445272952991]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40849316, 37.78445273]}]}

Source records

Public Works coordinated projects (DotMaps) key 63611 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Hallidie Plaza Accessibility Improvements is an active roadway and accessibility project in downtown San Francisco, near Cyril Magnin Street and the Powell Street BART/Muni station. Led by San Francisco Public Works' Bureau of Design and Construction, the project will remove the existing Market Street elevator and build a large pedestrian ramp connecting the street level to the plaza level, along with a smaller ramp linking the plaza level to the BART and Muni entrance. The project is currently in the design phase, with construction scheduled to run from April 2027 through June 2028. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Cyril Magnin St derived 2026-07-17 live
schedule.end 2028-06-30 reported 2026-07-17 live
schedule.start 2027-04-19 reported 2026-07-17 live
source.project_id 63611 reported 2026-07-17 live
contact.email Anastastia.Haddad@sfdpw.org reported 2026-07-17 live
contact.name Anastastia Haddad reported 2026-07-17 live
agency.owner SF DPW BDC - Landscape Architecture reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary, smaller ramp connecting Plaza Level to Powell Bart Station/Muni entrance. reported 2026-07-17 live
name Hallidie Plaza Accessibility Improvements reported 2026-07-17 live