Hallidie Plaza Accessibility Improvements
candidate project
Design
9ec2464c-099b-41e7-8f8f-15ff8b1918bc
The Hallidie Plaza Accessibility Improvements is an active roadway and accessibility project in downtown San Francisco, near Cyril Magnin Street and the Powell Street BART/Muni station. Led by San Francisco Public Works' Bureau of Design and Construction, the project will remove the existing Market Street elevator and build a large pedestrian ramp connecting the street level to the plaza level, along with a smaller ramp linking the plaza level to the BART and Muni entrance. The project is currently in the design phase, with construction scheduled to run from April 2027 through June 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW BDC - Landscape Architecture |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW BDC - Landscape Architecture” |
| contact.email | Anastastia.Haddad@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org” |
| contact.name | Anastastia Haddad |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad” |
| description | Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary, smaller ramp connecting Plaza Level to Powell Bart Station/Muni entrance. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary,...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| location.street_limits | Cyril Magnin St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Hallidie Plaza Accessibility Improvements |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Hallidie Plaza Accessibility Improvements” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2028-06-30 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-06-30T00:00:00.000” |
| schedule.start | 2027-04-19 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-04-19T00:00:00.000” |
| source.project_id | 63611 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63611” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Hallidie Plaza Accessibility Improvements is an active roadway and accessibility project in downtown San... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=338950d356bbc7585210fbb0e80bbe4210dc5fb440492c4cb91d4d391494b9ac” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 63611 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Hallidie Plaza Accessibility Improvements is an active roadway and accessibility project in downtown San Francisco, near Cyril Magnin Street and the Powell Street BART/Muni station. Led by San Francisco Public Works' Bureau of Design and Construction, the project will remove the existing Market Street elevator and build a large pedestrian ramp connecting the street level to the plaza level, along with a smaller ramp linking the plaza level to the BART and Muni entrance. The project is currently in the design phase, with construction scheduled to run from April 2027 through June 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Cyril Magnin St | derived | 2026-07-17 | live |
| schedule.end | 2028-06-30 | reported | 2026-07-17 | live |
| schedule.start | 2027-04-19 | reported | 2026-07-17 | live |
| source.project_id | 63611 | reported | 2026-07-17 | live |
| contact.email | Anastastia.Haddad@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Anastastia Haddad | reported | 2026-07-17 | live |
| agency.owner | SF DPW BDC - Landscape Architecture | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary, smaller ramp connecting Plaza Level to Powell Bart Station/Muni entrance. | reported | 2026-07-17 | live |
| name | Hallidie Plaza Accessibility Improvements | reported | 2026-07-17 | live |