Hallidie Plaza Accessibility Improvements

candidate project Design 9ec2464c-099b-41e7-8f8f-15ff8b1918bc

Current record

FieldValueProvenance
agency.owner SF DPW BDC - Landscape Architecture reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW BDC - Landscape Architecture”
contact.email Anastastia.Haddad@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Anastastia.Haddad@sfdpw.org”
contact.name Anastastia Haddad reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Anastastia Haddad”
description Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary, smaller ramp connecting Plaza Level to Powell Bart Station/Muni entrance. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary,...”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“1 published segment geometries”
location.street_limits Cyril Magnin St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Hallidie Plaza Accessibility Improvements reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Hallidie Plaza Accessibility Improvements”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Roadway reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway”
schedule.end 2028-06-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-06-30T00:00:00.000”
schedule.start 2027-04-19 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-04-19T00:00:00.000”
source.project_id 63611 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 63611”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 63611 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-07-17 live
location.street_limits Cyril Magnin St derived 2026-07-17 live
schedule.end 2028-06-30 reported 2026-07-17 live
schedule.start 2027-04-19 reported 2026-07-17 live
source.project_id 63611 reported 2026-07-17 live
contact.email Anastastia.Haddad@sfdpw.org reported 2026-07-17 live
contact.name Anastastia Haddad reported 2026-07-17 live
agency.owner SF DPW BDC - Landscape Architecture reported 2026-07-17 live
project_type Roadway reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Removal of the Market Street elevator, construction of a large-scale pedestrian ramp connecting Street Level to Plaza Level and a secondary, smaller ramp connecting Plaza Level to Powell Bart Station/Muni entrance. reported 2026-07-17 live
name Hallidie Plaza Accessibility Improvements reported 2026-07-17 live