Various Locations Pavement Renovation Concrete No 88
candidate project
Design
9e59e681-ef21-423f-950c-d06c8fd668bc
The Various Locations Pavement Renovation Concrete No. 88 is an active roadway paving project managed by San Francisco Public Works' Streets & Highways division. It covers about a dozen street segments across the city, including portions of Alabama, Sanchez, and Noe streets. The project is currently in the design phase, with construction scheduled to run from February 2029 to May 2030. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Streets & Highways |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways” |
| contact.email | Edmund.Lee@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Edmund.Lee@sfdpw.org” |
| contact.name | Edmund Lee |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Edmund Lee” |
| location.geometry | 11 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“11 published segment geometries” |
| location.street_limits | Alabama St; Alabama St from Ripley St to Esmeralda Ave \ Waltham St; Bret Harte Ter from Francisco St to End; Fair Oaks St from 21st St to 22nd St; Hancock St; Nellie St from 23rd St to Elizabeth St; Noe St from 22nd St to Alvarado St; Ripley St from Alabama St to Peralta Ave \ Samoset St; Sanchez St from 18th St to Hancock St; Sanchez St from Hancock St to 19th St; Willard St from Frederick St to Carl St |
derived
socrata:btxj-k9uh · retrieved 2026-08-11
“assembled from segment on/from/to street fields” |
| name | Various Locations Pavement Renovation Concrete No 88 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Various Locations Pavement Renovation Concrete No 88” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-08-11
“facility_type: Roadway” |
| schedule.end | 2030-05-13 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2030-05-13T00:00:00.000” |
| schedule.start | 2029-02-28 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2029-02-28T00:00:00.000” |
| source.project_id | 31465 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 31465” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Various Locations Pavement Renovation Concrete No. 88 is an active roadway paving project managed by San... |
generated
llm:summarize · retrieved 2026-08-11
“generated from 12 resolved fields; input sha256-v2=1f693da3eef231e82db04b207752b22099fa4ac0fd59f0120feef3015f1b0504” |
Changes
| 2026-08-27 | field changed immaterial | |
| 2026-08-11 | field changed immaterial | |
| 2026-08-11 | field changed immaterial | |
| 2026-08-11 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 31465 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 11 geometries | reported | 2026-08-27 | live |
| summary | The Various Locations Pavement Renovation Concrete No. 88 is an active roadway paving project managed by San Francisco Public Works' Streets & Highways division. It covers about a dozen street segments across the city, including portions of Alabama, Sanchez, and Noe streets. The project is currently in the design phase, with construction scheduled to run from February 2029 to May 2030. No cost figures have been published. | generated | 2026-08-11 | live |
| location.geometry | 11 geometries | reported | 2026-08-11 | superseded |
| location.street_limits | Alabama St; Alabama St from Ripley St to Esmeralda Ave \ Waltham St; Bret Harte Ter from Francisco St to End; Fair Oaks St from 21st St to 22nd St; Hancock St; Nellie St from 23rd St to Elizabeth St; Noe St from 22nd St to Alvarado St; Ripley St from Alabama St to Peralta Ave \ Samoset St; Sanchez St from 18th St to Hancock St; Sanchez St from Hancock St to 19th St; Willard St from Frederick St to Carl St | derived | 2026-08-11 | live |
| project_type | Roadway | reported | 2026-08-11 | live |
| summary | This is an active street repaving and sewer renovation project managed by San Francisco Public Works' Streets & Highways division, covering roughly a dozen scattered street segments across the city, including stretches of Alabama, Sanchez, Noe, and Fair Oaks streets. The work combines roadway pavement renovation with sanitary sewer improvements and is currently in the design phase. Construction is scheduled to run from February 2029 to May 2030. No cost figures have been published. | generated | 2026-07-18 | superseded |
| location.geometry | 13 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | Alabama St; Alabama St from Ripley St to Esmeralda Ave \ Waltham St; Bret Harte Ter; Bret Harte Ter from Francisco St to End; Fair Oaks St from 21st St to 22nd St; Frederick St; Hancock St; Nellie St from 23rd St to Elizabeth St; Noe St from 22nd St to Alvarado St; Ripley St from Alabama St to Peralta Ave \ Samoset St; Sanchez St from 18th St to Hancock St; Sanchez St from Hancock St to 19th St; Willard St from Frederick St to Carl St | derived | 2026-07-17 | superseded |
| schedule.end | 2030-05-13 | reported | 2026-07-17 | live |
| schedule.start | 2029-02-28 | reported | 2026-07-17 | live |
| source.project_id | 31465 | reported | 2026-07-17 | live |
| contact.email | Edmund.Lee@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Edmund Lee | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Streets & Highways | reported | 2026-07-17 | live |
| project_type | Sanitary Sewer, Roadway | reported | 2026-07-17 | superseded |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| name | Various Locations Pavement Renovation Concrete No 88 | reported | 2026-07-17 | live |