Lake Merced Water Level Restoration Project
candidate project
Design
9a0edec4-79ec-4b4c-8de8-c49c5df8bfd4
The Lake Merced Water Level Restoration Project is a stormwater and sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau, in coordination with the City of Daly City. It centers on the Vista Grande Drainage Basin Improvements, which aim to reduce storm-related flooding in the Vista Grande Watershed while restoring the natural connection to Lake Merced. The project is currently in the design phase, with work scheduled to run from November 2025 through the end of 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC - Engineering Management Bureau |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau” |
| contact.email | ONzewi@sfwater.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: ONzewi@sfwater.org” |
| contact.name | Obiajulu Nzewi |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Obiajulu Nzewi” |
| description | The City of Daly City is proposing and working in coordination with the SFPUC to implement the Vista Grande Drainage Basin Improvements project to address storm related flooding in the Vista Grande Watershed Drainage Basin while providing the benefit of restoring connection to the natural watershed of Lake Merced. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The City of Daly City is proposing and working in coordination with the SFPUC to implement the Vista Grande Drainage Basin Improvements project...” |
| location.geometry | 1 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries” |
| name | Lake Merced Water Level Restoration Project |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Lake Merced Water Level Restoration Project” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Sewer and storm drains |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sewer and storm drains” |
| schedule.end | 2029-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-12-31T00:00:00.000” |
| schedule.start | 2025-11-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-11-01T00:00:00.000” |
| source.project_id | 34027 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 34027” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Lake Merced Water Level Restoration Project is a stormwater and sewer project led by the San Francisco Public... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=2f56cf4c617bd5829f0499282fc39e11de59890b137484b5330838aa8c828846” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 34027 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 1 geometries | reported | 2026-08-27 | live |
| summary | The Lake Merced Water Level Restoration Project is a stormwater and sewer project led by the San Francisco Public Utilities Commission's Engineering Management Bureau, in coordination with the City of Daly City. It centers on the Vista Grande Drainage Basin Improvements, which aim to reduce storm-related flooding in the Vista Grande Watershed while restoring the natural connection to Lake Merced. The project is currently in the design phase, with work scheduled to run from November 2025 through the end of 2029. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 1 geometries | reported | 2026-07-17 | superseded |
| schedule.end | 2029-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2025-11-01 | reported | 2026-07-17 | live |
| source.project_id | 34027 | reported | 2026-07-17 | live |
| contact.email | ONzewi@sfwater.org | reported | 2026-07-17 | live |
| contact.name | Obiajulu Nzewi | reported | 2026-07-17 | live |
| agency.owner | SF PUC - Engineering Management Bureau | reported | 2026-07-17 | live |
| project_type | Sewer and storm drains | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The City of Daly City is proposing and working in coordination with the SFPUC to implement the Vista Grande Drainage Basin Improvements project to address storm related flooding in the Vista Grande Watershed Drainage Basin while providing the benefit of restoring connection to the natural watershed of Lake Merced. | reported | 2026-07-17 | live |
| name | Lake Merced Water Level Restoration Project | reported | 2026-07-17 | live |