Japantown Buchanan Street Mall Sewer Replacement

candidate project Design 98c23a47-91d3-496d-b71e-eae1b12d1433

The Japantown Buchanan Street Mall Sewer Replacement is a sanitary sewer project along Buchanan Street between Post and Sutter streets in San Francisco, owned by the Public Works Hydraulic division. The project is currently in the design phase, with construction scheduled to run from February 2026 to February 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2534i reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2534i”
location.geometry 1 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“1 published segment geometries”
location.street_limits Buchanan St from Post St to Sutter St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Japantown Buchanan Street Mall Sewer Replacement reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Japantown Buchanan Street Mall Sewer Replacement”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2027-02-08 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-02-08T00:00:00.000”
schedule.start 2026-02-08 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-02-08T00:00:00.000”
source.project_id 56313 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 56313”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Japantown Buchanan Street Mall Sewer Replacement is a sanitary sewer project along Buchanan Street between Post... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=830b65290a1780e3385bca69ae22053151f75a1830fddc72bd795029a6f586de”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.42978259229139, 37.78556384769057], [-122.42997893400121, 37.78650385882985]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.42978259, 37.78556385], [-122.42997893, 37.78650386]]}]}

Source records

Public Works coordinated projects (DotMaps) key 56313 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 1 geometries reported 2026-08-27 live
summary The Japantown Buchanan Street Mall Sewer Replacement is a sanitary sewer project along Buchanan Street between Post and Sutter streets in San Francisco, owned by the Public Works Hydraulic division. The project is currently in the design phase, with construction scheduled to run from February 2026 to February 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 1 geometries reported 2026-07-17 superseded
location.street_limits Buchanan St from Post St to Sutter St derived 2026-07-17 live
schedule.end 2027-02-08 reported 2026-07-17 live
schedule.start 2026-02-08 reported 2026-07-17 live
source.project_id 56313 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2534i reported 2026-07-17 live
name Japantown Buchanan Street Mall Sewer Replacement reported 2026-07-17 live