PW MTA New Castro Station Elevator
candidate project
Construction
977da62f-2b27-49aa-8026-402b4ae810a8
This is a Public Works project to design a new code-compliant, three-stop passenger elevator at the southwest corner of Castro Muni Station, along Market Street between Noe and Collingwood streets in San Francisco. Managed by SF DPW's Bureau of Architecture, the elevator would add redundancy and provide uninterrupted service. The effort is currently active and funded only through 95% construction documents and a permit package, and it is scheduled to run from June 2023 through September 2026.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW BDC - Architecture |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“agency_name: SF DPW BDC - Architecture” |
| contact.email | Jane.Y.Chan@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“project_manager_email: Jane.Y.Chan@sfdpw.org” |
| contact.name | Jane Chan |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“project_manager_name: Jane Chan” |
| description | Provide design services to add a new code-compliant 3-stop passenger elevator to create redundancy and uninterruped elevator service at the southwest corner of Castro Muni Station. Project is funded through 95% Construction Documents and Permit Package only. |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“description: Provide design services to add a new code-compliant 3-stop passenger elevator to create redundancy and uninterruped elevator service at the...” |
| location.geometry | 2 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“2 published segment geometries” |
| location.street_limits | Market St from 16th St \ Noe St to 17th St \ Castro St; Market St from 17th St \ Castro St to Collingwood St |
derived
socrata:btxj-k9uh · retrieved 2026-08-07
“assembled from segment on/from/to street fields” |
| name | PW MTA New Castro Station Elevator |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“name: PW MTA New Castro Station Elevator” |
| phase | Construction |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“project_phase: Construction” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“facility_type: Roadway” |
| schedule.end | 2026-09-30 |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“end_date: 2026-09-30T00:00:00.000” |
| schedule.start | 2023-06-20 |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“start_date: 2023-06-20T00:00:00.000” |
| source.project_id | 11876 |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“dotmapsid: 11876” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-08-07
“project_status: Active” |
| summary | This is a Public Works project to design a new code-compliant, three-stop passenger elevator at the southwest corner... |
generated
llm:summarize · retrieved 2026-08-07
“generated from 13 resolved fields; input sha256-v2=b3b514681aff985e70bfbfed66cd4d50b71aa4dbc8026123296bb81ef81e5074” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 11876 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 2 geometries | reported | 2026-08-27 | live |
| summary | This is a Public Works project to design a new code-compliant, three-stop passenger elevator at the southwest corner of Castro Muni Station, along Market Street between Noe and Collingwood streets in San Francisco. Managed by SF DPW's Bureau of Architecture, the elevator would add redundancy and provide uninterrupted service. The effort is currently active and funded only through 95% construction documents and a permit package, and it is scheduled to run from June 2023 through September 2026. | generated | 2026-08-07 | live |
| location.geometry | 2 geometries | reported | 2026-08-07 | superseded |
| location.street_limits | Market St from 16th St \ Noe St to 17th St \ Castro St; Market St from 17th St \ Castro St to Collingwood St | derived | 2026-08-07 | live |
| schedule.end | 2026-09-30 | reported | 2026-08-07 | live |
| schedule.start | 2023-06-20 | reported | 2026-08-07 | live |
| source.project_id | 11876 | reported | 2026-08-07 | live |
| contact.email | Jane.Y.Chan@sfdpw.org | reported | 2026-08-07 | live |
| contact.name | Jane Chan | reported | 2026-08-07 | live |
| agency.owner | SF DPW BDC - Architecture | reported | 2026-08-07 | live |
| project_type | Roadway | reported | 2026-08-07 | live |
| phase | Construction | reported | 2026-08-07 | live |
| status | Active | reported | 2026-08-07 | live |
| description | Provide design services to add a new code-compliant 3-stop passenger elevator to create redundancy and uninterruped elevator service at the southwest corner of Castro Muni Station. Project is funded through 95% Construction Documents and Permit Package only. | reported | 2026-08-07 | live |