Lincoln Way 19th Ave Sewer Rehabilitation (JV WD-2922)

candidate project Design 968d16be-43f3-46e9-a04c-760ce7f75288

The Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922) is an active sanitary sewer project led by San Francisco Public Works along Lincoln Way near 35th and 36th Avenues and between 19th and 20th Avenues. The project has two phases: the first pilots spiral wound lining rehabilitation of a 78-inch sewer, including new manhole construction, while the second installs cured-in-place lining as part of the SFWD-advertised WD-2922 contract. Currently in the design phase, the work is scheduled to run from August 2026 to December 2029. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description SFPW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part of SFWD-advertised WD-2922 contract. reported socrata:btxj-k9uh · retrieved 2026-08-21
“description: SFPW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part of SFWD-advertised WD-2922 contract.”
location.geometry 5 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“5 published segment geometries”
location.street_limits 19th Ave; 20th Ave; 36th Ave; Lincoln Way from 19th Ave \ Crossover Dr to 20th Ave; Lincoln Way from 35th Ave to 36th Ave derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Lincoln Way 19th Ave Sewer Rehabilitation (JV WD-2922) reported socrata:btxj-k9uh · retrieved 2026-08-21
“name: Lincoln Way 19th Ave Sewer Rehabilitation (JV WD-2922)”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2029-12-20 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-12-20T00:00:00.000”
schedule.start 2026-08-13 reported socrata:btxj-k9uh · retrieved 2026-08-19
“start_date: 2026-08-13T00:00:00.000”
source.project_id 50489 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 50489”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922) is an active sanitary sewer project led by San Francisco... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=f588ea30691351560a0f8dea8c4e27432206fbdb9761478b9670f25c3342a09f”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.47730839463374, 37.765447986810614]}, {'type': 'Point', 'coordinates': [-122.47832482135998, 37.76539913620081]}, {'type': 'Point', 'coordinates': [-122.4954753086624, 37.76463804385918]}, {'type': 'LineString', 'coordinates': [[-122.47730839446942, 37.76544798692431], [-122.4774781394177, 37.76539305592184], [-122.47820069519325, 37.76535832891561], [-122.47832482119098, 37.76539913613879]]}, {'type': 'LineString', 'coordinates': [[-122.49440249361045, 37.76468619126377], [-122.49451375587489, 37.764729570860226], [-122.49534501326012, 37.764706213555066], [-122.49547530871948, 37.76463804396916]]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.47730839, 37.76544799]}, {'type': 'Point', 'coordinates': [-122.47832482, 37.76539914]}, {'type': 'Point', 'coordinates': [-122.49547531, 37.76463804]}, {'type': 'LineString', 'coordinates': [[-122.47730839, 37.76544799], [-122.47747814, 37.76539306], [-122.4782007, 37.76535833], [-122.47832482, 37.76539914]]}, {'type': 'LineString', 'coordinates': [[-122.49440249, 37.76468619], [-122.49451376, 37.76472957], [-122.49534501, 37.76470621], [-122.49547531, 37.76463804]]}]}
2026-08-21 field changed immaterial PW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract.SFPW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part of SFWD-advertised WD-2922 contract.
2026-08-21 field changed immaterial Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922)Lincoln Way 19th Ave Sewer Rehabilitation (JV WD-2922)
2026-08-20 field changed immaterial PW ID 2565I. Phase 1 consists of new manhole construction via a job order contract at 35th Ave and Lincoln Way to pilot spiral wound lining rehabilitation of a 78-inch sewer between 35th and 36th Ave. Phase 2 consists of sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract.PW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract.
2026-08-19 start date changed immaterial 2026-08-072026-08-13

Source records

Public Works coordinated projects (DotMaps) key 50489 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 5 geometries reported 2026-08-27 live
description SFPW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part of SFWD-advertised WD-2922 contract. reported 2026-08-21 live
name Lincoln Way 19th Ave Sewer Rehabilitation (JV WD-2922) reported 2026-08-21 live
description PW ID 2565I. Sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract. reported 2026-08-20 superseded
schedule.start 2026-08-13 reported 2026-08-19 live
summary The Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922) is an active sanitary sewer project led by San Francisco Public Works along Lincoln Way near 35th and 36th Avenues and between 19th and 20th Avenues. The project has two phases: the first pilots spiral wound lining rehabilitation of a 78-inch sewer, including new manhole construction, while the second installs cured-in-place lining as part of the SFWD-advertised WD-2922 contract. Currently in the design phase, the work is scheduled to run from August 2026 to December 2029. No cost figures have been published. generated 2026-07-18 live
location.geometry 5 geometries reported 2026-07-17 superseded
location.street_limits 19th Ave; 20th Ave; 36th Ave; Lincoln Way from 19th Ave \ Crossover Dr to 20th Ave; Lincoln Way from 35th Ave to 36th Ave derived 2026-07-17 live
schedule.end 2029-12-20 reported 2026-07-17 live
schedule.start 2026-08-07 reported 2026-07-17 superseded
source.project_id 50489 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description PW ID 2565I. Phase 1 consists of new manhole construction via a job order contract at 35th Ave and Lincoln Way to pilot spiral wound lining rehabilitation of a 78-inch sewer between 35th and 36th Ave. Phase 2 consists of sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract. reported 2026-07-17 superseded
name Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922) reported 2026-07-17 superseded