sfproj. every fact links to its evidence

← all projects

Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922)

candidate project Design 968d16be-43f3-46e9-a04c-760ce7f75288

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description PW ID 2565I. Phase 1 consists of new manhole construction via a job order contract at 35th Ave and Lincoln Way to pilot spiral wound lining rehabilitation of a 78-inch sewer between 35th and 36th Ave. Phase 2 consists of sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: PW ID 2565I. Phase 1 consists of new manhole construction via a job order contract at 35th Ave and Lincoln Way to pilot spiral wound lining...”
location.geometry 5 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“5 published segment geometries”
location.street_limits 19th Ave; 20th Ave; 36th Ave; Lincoln Way from 19th Ave \ Crossover Dr to 20th Ave; Lincoln Way from 35th Ave to 36th Ave derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922) reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922)”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2029-12-20 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-12-20T00:00:00.000”
schedule.start 2026-08-07 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2026-08-07T00:00:00.000”
source.project_id 50489 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 50489”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 50489 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 5 geometries reported 2026-07-17 live
location.street_limits 19th Ave; 20th Ave; 36th Ave; Lincoln Way from 19th Ave \ Crossover Dr to 20th Ave; Lincoln Way from 35th Ave to 36th Ave derived 2026-07-17 live
schedule.end 2029-12-20 reported 2026-07-17 live
schedule.start 2026-08-07 reported 2026-07-17 live
source.project_id 50489 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description PW ID 2565I. Phase 1 consists of new manhole construction via a job order contract at 35th Ave and Lincoln Way to pilot spiral wound lining rehabilitation of a 78-inch sewer between 35th and 36th Ave. Phase 2 consists of sewer cured in place lining between 19th and 20th Ave as part the SFWD-advertised WD-2922 contract. reported 2026-07-17 live
name Lincoln Way 32nd Ave Sewer Rehabilitation (JV WD-2922) reported 2026-07-17 live