Lincoln Way New Traffic Signals
candidate project
Design
9545b9b5-813a-4c26-98ed-ad9ffe0d69a9
The Lincoln Way New Traffic Signals project is an active capital project managed by SF MTA's Transportation Engineering division to install new traffic signals along Lincoln Way, including poles, street lighting, pedestrian countdown signals, accessible pedestrian signals, and new ADA-compliant curb ramps where they are currently missing. The project is in the design phase, with construction scheduled to run from April 2028 to March 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Transportation Engineering (Capital) |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)” |
| contact.email | jarrett.hornbostel@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: jarrett.hornbostel@sfmta.com” |
| contact.name | Jarrett Hornbostel |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Jarrett Hornbostel” |
| description | Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals (APS) in addition to new ADA compliant curb ramps where they do not already exist. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals...” |
| location.geometry | 2 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“2 published segment geometries” |
| location.street_limits | LINCOLN WAY |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Lincoln Way New Traffic Signals |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Lincoln Way New Traffic Signals” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Traffic Signals |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Traffic Signals” |
| schedule.end | 2029-03-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-03-31T00:00:00.000” |
| schedule.start | 2028-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-04-01T00:00:00.000” |
| source.project_id | 51215 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 51215” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Lincoln Way New Traffic Signals project is an active capital project managed by SF MTA's Transportation... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=1b0195a5821a506d9c06276c3d649494e3b19c33b653df7f5f11ad4eb00143b9” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 51215 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 2 geometries | reported | 2026-08-27 | live |
| summary | The Lincoln Way New Traffic Signals project is an active capital project managed by SF MTA's Transportation Engineering division to install new traffic signals along Lincoln Way, including poles, street lighting, pedestrian countdown signals, accessible pedestrian signals, and new ADA-compliant curb ramps where they are currently missing. The project is in the design phase, with construction scheduled to run from April 2028 to March 2029. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 2 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | LINCOLN WAY | derived | 2026-07-17 | live |
| schedule.end | 2029-03-31 | reported | 2026-07-17 | live |
| schedule.start | 2028-04-01 | reported | 2026-07-17 | live |
| source.project_id | 51215 | reported | 2026-07-17 | live |
| contact.email | jarrett.hornbostel@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Jarrett Hornbostel | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Transportation Engineering (Capital) | reported | 2026-07-17 | live |
| project_type | Traffic Signals | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals (APS) in addition to new ADA compliant curb ramps where they do not already exist. | reported | 2026-07-17 | live |
| name | Lincoln Way New Traffic Signals | reported | 2026-07-17 | live |