2021-008: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave

candidate project Planning Pre-Planning 9418bfb2-d12e-4484-9370-1b276c6080b4

This is a San Francisco Public Utilities Commission water project to replace aging 8-inch ductile iron water mains in the Sunset District, along streets between 18th and 15th Avenues in the vicinity of Moraga, Noriega, Ortega, and Pacheco Streets. The project is in the pre-planning phase and is scheduled to run from April 2025 through April 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave”
location.geometry 9 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“9 published segment geometries”
location.street_limits 15TH AVE from NORIEGA ST to PACHECO ST; 16TH AVE; 17TH AVE from MORAGA ST to PACHECO ST; 18TH AVE from MORAGA ST to ORTEGA ST; MORAGA ST; NORIEGA ST; ORTEGA ST; PACHECO ST from 15TH AVE to 17TH AVE derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 2021-008: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 2021-008: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2027-04-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-04-30T00:00:00.000”
schedule.start 2025-04-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-04-01T00:00:00.000”
source.project_id 9117 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9117”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a San Francisco Public Utilities Commission water project to replace aging 8-inch ductile iron water mains... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=84814269ea77670048460f6103b82d406242ef8d43c16a794205cdcb99e28262”

Source records

Public Works coordinated projects (DotMaps) key 9117 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a San Francisco Public Utilities Commission water project to replace aging 8-inch ductile iron water mains in the Sunset District, along streets between 18th and 15th Avenues in the vicinity of Moraga, Noriega, Ortega, and Pacheco Streets. The project is in the pre-planning phase and is scheduled to run from April 2025 through April 2027. No cost figures have been published. generated 2026-07-17 live
location.geometry 9 geometries reported 2026-07-17 live
location.street_limits 15TH AVE from NORIEGA ST to PACHECO ST; 16TH AVE; 17TH AVE from MORAGA ST to PACHECO ST; 18TH AVE from MORAGA ST to ORTEGA ST; MORAGA ST; NORIEGA ST; ORTEGA ST; PACHECO ST from 15TH AVE to 17TH AVE derived 2026-07-17 live
schedule.end 2027-04-30 reported 2026-07-17 live
schedule.start 2025-04-01 reported 2026-07-17 live
source.project_id 9117 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave reported 2026-07-17 live
name 2021-008: 8-inch Ductile Iron Water Main Replacement on Moraga to Ortega, from 18th Ave to 15th Ave reported 2026-07-17 live