1819-004: 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th St to 22nd St, and on Various Local Area Streets

candidate project Planning Pre-Planning 8b47fbcd-90c3-4d09-9fa1-11840528999d

This is a San Francisco Public Utilities Commission water project to rehabilitate 12-inch water mains and replace 8-inch water mains in the Potrero Hill area, centered on 19th Street between Pennsylvania Avenue and Wisconsin Street, along Wisconsin Street, and on various nearby local streets. The project is in early pre-planning, with construction scheduled to run from January 2027 through June 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF PUC Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water”
description 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th St to 22nd St, and on Various Local Area Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th St...”
location.geometry 7 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“7 published segment geometries”
location.street_limits 19TH ST from WISCONSIN ST to PENNSYLVANIA AVE; ARKANSAS ST; MISSISSIPPI ST; MISSOURI ST; PENNSYLVANIA AVE; TEXAS ST from SIERRA ST to 20TH ST; WISCONSIN ST from 19TH ST to 22ND ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name 1819-004: 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th St to 22nd St, and on Various Local Area Streets reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: 1819-004: 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th...”
phase Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning”
project_type Water reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water”
schedule.end 2028-06-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-06-30T00:00:00.000”
schedule.start 2027-01-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-01-01T00:00:00.000”
source.project_id 9104 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9104”
status Pre-Planning reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning”
summary This is a San Francisco Public Utilities Commission water project to rehabilitate 12-inch water mains and replace... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=14aebf51b5eae7c0ed4e8ac0fd80ea98bd02d3140408760bd8f180ae3bd733c8”

Source records

Public Works coordinated projects (DotMaps) key 9104 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary This is a San Francisco Public Utilities Commission water project to rehabilitate 12-inch water mains and replace 8-inch water mains in the Potrero Hill area, centered on 19th Street between Pennsylvania Avenue and Wisconsin Street, along Wisconsin Street, and on various nearby local streets. The project is in early pre-planning, with construction scheduled to run from January 2027 through June 2028. No cost figures have been published. generated 2026-07-17 live
location.geometry 7 geometries reported 2026-07-17 live
location.street_limits 19TH ST from WISCONSIN ST to PENNSYLVANIA AVE; ARKANSAS ST; MISSISSIPPI ST; MISSOURI ST; PENNSYLVANIA AVE; TEXAS ST from SIERRA ST to 20TH ST; WISCONSIN ST from 19TH ST to 22ND ST derived 2026-07-17 live
schedule.end 2028-06-30 reported 2026-07-17 live
schedule.start 2027-01-01 reported 2026-07-17 live
source.project_id 9104 reported 2026-07-17 live
agency.owner SF PUC Water reported 2026-07-17 live
project_type Water reported 2026-07-17 live
phase Planning reported 2026-07-17 live
status Pre-Planning reported 2026-07-17 live
description 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th St to 22nd St, and on Various Local Area Streets reported 2026-07-17 live
name 1819-004: 12- inch Water Main Rehabilitation and 8-inch Water Main Replacement on 19th Street from Pennsylvania to Wisconsin, on Wisconsin from 19th St to 22nd St, and on Various Local Area Streets reported 2026-07-17 live