sfproj. every fact links to its evidence

← all projects

Contract 66: New Traffic Signals

candidate project Design 87045688-e885-4139-a0b3-48e1a332d3d3

A San Francisco Municipal Transportation Agency project, Contract 66: New Traffic Signals will install new traffic signals—including poles, signals, street lighting, pedestrian countdown signals, and accessible pedestrian signals—along with new ADA-compliant curb ramps where they don't already exist. The work spans multiple locations across the city, including stretches of Cesar Chavez Street, Fulton Street, and Lincoln Way. The project is currently in the design phase, with construction scheduled to run from March 2027 to March 2028. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF MTA SS - Transportation Engineering (Capital) reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Transportation Engineering (Capital)”
description Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals (APS) in addition to new ADA compliant curb ramps where they do not already exist. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals...”
location.geometry 11 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“11 published segment geometries”
location.street_limits 28TH ST; 4TH AVE; 4TH ST; CESAR CHAVEZ ST; COTTER ST; FULTON ST; LINCOLN WAY; LONG BRIDGE ST; MINT ST; WALLER ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Contract 66: New Traffic Signals reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Contract 66: New Traffic Signals”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Traffic Signals reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Traffic Signals”
schedule.end 2028-03-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-03-01T00:00:00.000”
schedule.start 2027-03-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-03-01T00:00:00.000”
source.project_id 9108 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 9108”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary A San Francisco Municipal Transportation Agency project, Contract 66: New Traffic Signals will install new traffic... generated llm:summarize · retrieved 2026-07-17
“generated from 11 resolved fields; input sha256-v2=90a5dd149bbb29f9d2660e4838468bb53be19f0ae14669d2526dd10946225d51”

Source records

Public Works coordinated projects (DotMaps) key 9108 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
summary A San Francisco Municipal Transportation Agency project, Contract 66: New Traffic Signals will install new traffic signals—including poles, signals, street lighting, pedestrian countdown signals, and accessible pedestrian signals—along with new ADA-compliant curb ramps where they don't already exist. The work spans multiple locations across the city, including stretches of Cesar Chavez Street, Fulton Street, and Lincoln Way. The project is currently in the design phase, with construction scheduled to run from March 2027 to March 2028. No cost figures have been published. generated 2026-07-17 live
location.geometry 11 geometries reported 2026-07-17 live
location.street_limits 28TH ST; 4TH AVE; 4TH ST; CESAR CHAVEZ ST; COTTER ST; FULTON ST; LINCOLN WAY; LONG BRIDGE ST; MINT ST; WALLER ST derived 2026-07-17 live
schedule.end 2028-03-01 reported 2026-07-17 live
schedule.start 2027-03-01 reported 2026-07-17 live
source.project_id 9108 reported 2026-07-17 live
agency.owner SF MTA SS - Transportation Engineering (Capital) reported 2026-07-17 live
project_type Traffic Signals reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Construct new traffic signals including poles, signals, street lighting, pedestrian countdown signals (PCS), and accessible pedestrian signals (APS) in addition to new ADA compliant curb ramps where they do not already exist. reported 2026-07-17 live
name Contract 66: New Traffic Signals reported 2026-07-17 live