WD-2934 16- and 8-inch Ductile Iron Water Main Replacement on Andover to Peralta from Tompkins to Cortland Ave
candidate project
Design
Committed
82a6572e-4306-4be7-a0a7-d4ca3e4f7f82
This is a San Francisco Public Utilities Commission water project to replace aging 8-inch and 16-inch ductile iron water mains in the Bernal Heights area, covering a network of streets including Moultrie, Ellsworth, and Gates between Tompkins and Cortland avenues. The project spans 19 street segments and is currently in the design phase, with work committed and scheduled to run from April 2025 through the end of 2030. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC Water” |
| description | 8-inch Ductile Iron Water Main Replacement on Moultrie, Anderson, Ellsworth, and Gates from Crescent to Cortland |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: 8-inch Ductile Iron Water Main Replacement on Moultrie, Anderson, Ellsworth, and Gates from Crescent to Cortland” |
| location.geometry | 19 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“19 published segment geometries” |
| location.street_limits | ANDERSON ST; ANDOVER ST; BANKS ST; BRADFORD ST; BRADFORD ST from TOMPKINS AVE to BRADFORD ST; BRONTE ST; ELLSWORTH ST; FOLSOM ST; GATES ST; JARBOE AVE from BRONTE ST to MOULTRIE ST; MOJAVE ST; MOULTRIE ST; NEVADA ST from CORTLAND AVE to TOMPKINS AVE; PERALTA AVE; PRENTISS ST; TOMPKINS AVE; TOMPKINS AVE from NEVADA ST to ANDOVER ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | WD-2934 16- and 8-inch Ductile Iron Water Main Replacement on Andover to Peralta from Tompkins to Cortland Ave |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: WD-2934 16- and 8-inch Ductile Iron Water Main Replacement on Andover to Peralta from Tompkins to Cortland Ave” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2030-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2030-12-31T00:00:00.000” |
| schedule.start | 2025-04-21 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-04-21T00:00:00.000” |
| source.project_id | 16929 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 16929” |
| status | Committed |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Committed” |
| summary | This is a San Francisco Public Utilities Commission water project to replace aging 8-inch and 16-inch ductile iron... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=05cffe78dca4cbc47eefb6ff18ffa1c72fb48adce988fb60b00c0e17fd7a9b66” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 16929 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 19 geometries | reported | 2026-08-27 | live |
| summary | This is a San Francisco Public Utilities Commission water project to replace aging 8-inch and 16-inch ductile iron water mains in the Bernal Heights area, covering a network of streets including Moultrie, Ellsworth, and Gates between Tompkins and Cortland avenues. The project spans 19 street segments and is currently in the design phase, with work committed and scheduled to run from April 2025 through the end of 2030. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 19 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | ANDERSON ST; ANDOVER ST; BANKS ST; BRADFORD ST; BRADFORD ST from TOMPKINS AVE to BRADFORD ST; BRONTE ST; ELLSWORTH ST; FOLSOM ST; GATES ST; JARBOE AVE from BRONTE ST to MOULTRIE ST; MOJAVE ST; MOULTRIE ST; NEVADA ST from CORTLAND AVE to TOMPKINS AVE; PERALTA AVE; PRENTISS ST; TOMPKINS AVE; TOMPKINS AVE from NEVADA ST to ANDOVER ST | derived | 2026-07-17 | live |
| schedule.end | 2030-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2025-04-21 | reported | 2026-07-17 | live |
| source.project_id | 16929 | reported | 2026-07-17 | live |
| agency.owner | SF PUC Water | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Committed | reported | 2026-07-17 | live |
| description | 8-inch Ductile Iron Water Main Replacement on Moultrie, Anderson, Ellsworth, and Gates from Crescent to Cortland | reported | 2026-07-17 | live |
| name | WD-2934 16- and 8-inch Ductile Iron Water Main Replacement on Andover to Peralta from Tompkins to Cortland Ave | reported | 2026-07-17 | live |