sfproj. every fact links to its evidence

← all projects

Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Renovation and Sewer Replacement

candidate project Design 8272dfb2-fa58-40ce-ae0b-8c282372b155

This is an active sewer replacement, rehabilitation, and relocation project in San Francisco's northeast downtown area, covering segments of Front, Sansome, Bush, and Pacific streets between Broadway and Vallejo Street, alongside pavement renovation. Owned by San Francisco Public Works (Hydraulic division), the project is currently in the design phase, with work having started in February 2024 and scheduled to finish by April 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email JoWong@sfwater.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: JoWong@sfwater.org”
contact.name Johnny Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Johnny Wong”
description Sewer Replacement/Rehabilitation/Relocation reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: Sewer Replacement/Rehabilitation/Relocation”
location.geometry 5 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“5 published segment geometries”
location.street_limits BUSH ST; FRONT ST; PACIFIC AVE; SANSOME ST from BROADWAY to VALLEJO ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Renovation and Sewer Replacement reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Renovation and Sewer Replacement”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sewer”
schedule.end 2027-04-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-04-01T00:00:00.000”
schedule.start 2024-02-22 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-02-22T00:00:00.000”
source.project_id 26875 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 26875”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary This is an active sewer replacement, rehabilitation, and relocation project in San Francisco's northeast downtown... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=ee5ff2d8994b92902c8e68363cf35f6b287605702dee175c4dc52fc7e428b62f”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.40205419797537, 37.797509891764314]}, {'type': 'LineString', 'coordinates': [[-122.40224185510769, 37.79843464900463], [-122.40243388221528, 37.79938708812911]]}, {'type': 'Point', 'coordinates': [-122.39958524302492, 37.791331480552756]}, {'type': 'LineString', 'coordinates': [[-122.39860104932731, 37.79241316837557], [-122.39849532625483, 37.791894466636435], [-122.39834403319846, 37.79177389809419]]}, {'type': 'Point', 'coordinates': [-122.39879486157423, 37.79336404726774]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'Point', 'coordinates': [-122.4020542, 37.79750989]}, {'type': 'LineString', 'coordinates': [[-122.40224186, 37.79843465], [-122.40243388, 37.79938709]]}, {'type': 'Point', 'coordinates': [-122.39958524, 37.79133148]}, {'type': 'LineString', 'coordinates': [[-122.39860105, 37.79241317], [-122.39849533, 37.79189447], [-122.39834403, 37.7917739]]}, {'type': 'Point', 'coordinates': [-122.39879486, 37.79336405]}]}

Source records

Public Works coordinated projects (DotMaps) key 26875 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 5 geometries reported 2026-08-27 live
summary This is an active sewer replacement, rehabilitation, and relocation project in San Francisco's northeast downtown area, covering segments of Front, Sansome, Bush, and Pacific streets between Broadway and Vallejo Street, alongside pavement renovation. Owned by San Francisco Public Works (Hydraulic division), the project is currently in the design phase, with work having started in February 2024 and scheduled to finish by April 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 5 geometries reported 2026-07-17 superseded
location.street_limits BUSH ST; FRONT ST; PACIFIC AVE; SANSOME ST from BROADWAY to VALLEJO ST derived 2026-07-17 live
schedule.end 2027-04-01 reported 2026-07-17 live
schedule.start 2024-02-22 reported 2026-07-17 live
source.project_id 26875 reported 2026-07-17 live
contact.email JoWong@sfwater.org reported 2026-07-17 live
contact.name Johnny Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description Sewer Replacement/Rehabilitation/Relocation reported 2026-07-17 live
name Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Renovation and Sewer Replacement reported 2026-07-17 live