Golden Gate Park Access Project
candidate project
Planning
7fa3c2bc-a210-41c5-8083-22c355d1779c
The Golden Gate Park Access Project is a planning-phase effort by the SFMTA's Livable Streets division to close gaps in the biking and rolling network around John F. Kennedy Drive in Golden Gate Park. The project would better connect the car-free JFK Promenade with the Panhandle Path, the Fell Street bikeway, and nearby routes through improvements such as a two-way bikeway between the park entrance and Shrader Street, new signals and a realigned intersection at JFK and Kezar, a realigned shared-use path, and landscaping. Currently active, the work is scheduled to run from February 2025 through the end of 2028. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF MTA SS - Livable Streets |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF MTA SS - Livable Streets” |
| contact.email | elizabeth.chen@sfmta.com |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: elizabeth.chen@sfmta.com” |
| contact.name | Elizabeth Chen |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Elizabeth Chen” |
| description | The Golden Gate Park Access Project aims to improve existing gaps in the biking and rolling network to better connect the car-free JFK Promenade with the multi-use Panhandle Path, the existing Fell Street bikeway, the proposed Oak Street Quick-Build bikeway, and the shared-use path leading to Page Slow Street. Potential improvements include two-way bikeway between Golden Gate Park entrance and Shrader Street, new signals at JFK/Kezar, intersection realignment at JFK/Kezar, shared-use path realignment from Page to Kezar, and landscaping. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The Golden Gate Park Access Project aims to improve existing gaps in the biking and rolling network to better connect the car-free JFK...” |
| location.geometry | 2 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“2 published segment geometries” |
| location.street_limits | JOHN F KENNEDY DR |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Golden Gate Park Access Project |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Golden Gate Park Access Project” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Bike path; signal and intersection upgrades |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Bike path; signal and intersection upgrades” |
| schedule.end | 2028-12-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-12-31T00:00:00.000” |
| schedule.start | 2025-02-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2025-02-01T00:00:00.000” |
| source.project_id | 37762 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 37762” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Golden Gate Park Access Project is a planning-phase effort by the SFMTA's Livable Streets division to close gaps... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=dfee80c42905ed7ca8125c3efcb8d16e0552d9057ae9482618d001054984db27” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 37762 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 2 geometries | reported | 2026-08-27 | live |
| summary | The Golden Gate Park Access Project is a planning-phase effort by the SFMTA's Livable Streets division to close gaps in the biking and rolling network around John F. Kennedy Drive in Golden Gate Park. The project would better connect the car-free JFK Promenade with the Panhandle Path, the Fell Street bikeway, and nearby routes through improvements such as a two-way bikeway between the park entrance and Shrader Street, new signals and a realigned intersection at JFK and Kezar, a realigned shared-use path, and landscaping. Currently active, the work is scheduled to run from February 2025 through the end of 2028. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 2 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | JOHN F KENNEDY DR | derived | 2026-07-17 | live |
| schedule.end | 2028-12-31 | reported | 2026-07-17 | live |
| schedule.start | 2025-02-01 | reported | 2026-07-17 | live |
| source.project_id | 37762 | reported | 2026-07-17 | live |
| contact.email | elizabeth.chen@sfmta.com | reported | 2026-07-17 | live |
| contact.name | Elizabeth Chen | reported | 2026-07-17 | live |
| agency.owner | SF MTA SS - Livable Streets | reported | 2026-07-17 | live |
| project_type | Bike path; signal and intersection upgrades | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The Golden Gate Park Access Project aims to improve existing gaps in the biking and rolling network to better connect the car-free JFK Promenade with the multi-use Panhandle Path, the existing Fell Street bikeway, the proposed Oak Street Quick-Build bikeway, and the shared-use path leading to Page Slow Street. Potential improvements include two-way bikeway between Golden Gate Park entrance and Shrader Street, new signals at JFK/Kezar, intersection realignment at JFK/Kezar, shared-use path realignment from Page to Kezar, and landscaping. | reported | 2026-07-17 | live |
| name | Golden Gate Park Access Project | reported | 2026-07-17 | live |