Contract 66 New Traffic Signals
candidate project
Design
7da969d6-f6e7-4345-b3ad-ebd5039c6d55
Contract 66 New Traffic Signals is a roadway project by San Francisco Public Works (IDC – Electrical) to install new traffic signals at 12 locations across the city, including intersections along 4th Avenue, 4th Street, and Mission Street. Each location will receive pedestrian countdown signals, accessible pedestrian signals, controllers, wiring, poles, and curb ramps. The project is active and currently in the design phase, with construction scheduled to run from July 2027 to January 2029. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Electrical |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Electrical” |
| contact.email | Jenny.Chan@sfdpw.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Jenny.Chan@sfdpw.org” |
| contact.name | Jenny Chan |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Jenny Chan” |
| description | Contract 66 will install new traffic signals at (12) locations. All new signal locations will have new pedestrian countdown signals (PCS), accessible pedestrian signals (APS), controllers, conduit, wiring, poles, and curb ramps. The (12) locations that will receive traffic signals are 10th Avenue\Lincoln, 39th Avenue\Fulton, 28th Street\Guerrero, 41st Avenue\Lincoln, 4th Street\Long Bridge, 4th Street\Mission Rock, 4th Avenue\Fulton, Mission\Mary\Mint, Cesar Chavez\Florida, Divisadero\Castro\Wal |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: Contract 66 will install new traffic signals at (12) locations. All new signal locations will have new pedestrian countdown signals (PCS),...” |
| location.geometry | 15 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“15 published segment geometries” |
| location.street_limits | 04th Ave; 04th St; 10th Ave; 28th St; 39th Ave; 41st Ave; Alemany Blvd; Castro St; Cesar Chavez St; Great Hwy; Mary St; Mint St; Mission St from Mint St to Mary St |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Contract 66 New Traffic Signals |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Contract 66 New Traffic Signals” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2029-01-10 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2029-01-10T00:00:00.000” |
| schedule.start | 2027-07-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-07-01T00:00:00.000” |
| source.project_id | 52354 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 52354” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | Contract 66 New Traffic Signals is a roadway project by San Francisco Public Works (IDC – Electrical) to install new... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=a0921ee0864b17e7628a2df9389d64e13a698d68b25c180411838f7451cd456f” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 52354 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 15 geometries | reported | 2026-08-27 | live |
| summary | Contract 66 New Traffic Signals is a roadway project by San Francisco Public Works (IDC – Electrical) to install new traffic signals at 12 locations across the city, including intersections along 4th Avenue, 4th Street, and Mission Street. Each location will receive pedestrian countdown signals, accessible pedestrian signals, controllers, wiring, poles, and curb ramps. The project is active and currently in the design phase, with construction scheduled to run from July 2027 to January 2029. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 15 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 04th Ave; 04th St; 10th Ave; 28th St; 39th Ave; 41st Ave; Alemany Blvd; Castro St; Cesar Chavez St; Great Hwy; Mary St; Mint St; Mission St from Mint St to Mary St | derived | 2026-07-17 | live |
| schedule.end | 2029-01-10 | reported | 2026-07-17 | live |
| schedule.start | 2027-07-01 | reported | 2026-07-17 | live |
| source.project_id | 52354 | reported | 2026-07-17 | live |
| contact.email | Jenny.Chan@sfdpw.org | reported | 2026-07-17 | live |
| contact.name | Jenny Chan | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Electrical | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | Contract 66 will install new traffic signals at (12) locations. All new signal locations will have new pedestrian countdown signals (PCS), accessible pedestrian signals (APS), controllers, conduit, wiring, poles, and curb ramps. The (12) locations that will receive traffic signals are 10th Avenue\Lincoln, 39th Avenue\Fulton, 28th Street\Guerrero, 41st Avenue\Lincoln, 4th Street\Long Bridge, 4th Street\Mission Rock, 4th Avenue\Fulton, Mission\Mary\Mint, Cesar Chavez\Florida, Divisadero\Castro\Wal | reported | 2026-07-17 | live |
| name | Contract 66 New Traffic Signals | reported | 2026-07-17 | live |