Griffith DW Force Main Rehabilitation

candidate project Design 7bdb5133-0749-4794-a0a1-19f6525bd345

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2546i_The project involves the replacement of 100LF of the existing 20-inch diameter steel Griffith Dry Weather force main with 20-inch HDPE pipe including all associated restoration work. The majority of the force main is on the Griffith Pump Station grounds with only a small portion on Shafter Ave in the public ROW. There is also conditional work to replace 200 LF of the 21-inch concrete force main with HDPE pipe which is dependent upon inspection of the pipe during construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2546i_The project involves the replacement of 100LF of the existing 20-inch diameter steel Griffith Dry Weather force main with 20-inch HDPE...”
location.geometry 2 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“2 published segment geometries”
location.street_limits Griffith St; Shafter Ave from End to Griffith St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Griffith DW Force Main Rehabilitation reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Griffith DW Force Main Rehabilitation”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2027-10-18 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-10-18T00:00:00.000”
schedule.start 2027-03-22 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-03-22T00:00:00.000”
source.project_id 51430 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 51430”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 51430 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 2 geometries reported 2026-07-17 live
location.street_limits Griffith St; Shafter Ave from End to Griffith St derived 2026-07-17 live
schedule.end 2027-10-18 reported 2026-07-17 live
schedule.start 2027-03-22 reported 2026-07-17 live
source.project_id 51430 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2546i_The project involves the replacement of 100LF of the existing 20-inch diameter steel Griffith Dry Weather force main with 20-inch HDPE pipe including all associated restoration work. The majority of the force main is on the Griffith Pump Station grounds with only a small portion on Shafter Ave in the public ROW. There is also conditional work to replace 200 LF of the 21-inch concrete force main with HDPE pipe which is dependent upon inspection of the pipe during construction reported 2026-07-17 live
name Griffith DW Force Main Rehabilitation reported 2026-07-17 live