Griffith DW Force Main Rehabilitation

candidate project Design 7bdb5133-0749-4794-a0a1-19f6525bd345

The Griffith DW Force Main Rehabilitation is an active sanitary sewer project owned by San Francisco Public Works, located on the Griffith Pump Station grounds and a short section of Shafter Avenue. The project will replace about 100 feet of the existing 20-inch steel dry-weather force main with 20-inch HDPE pipe, plus associated restoration; a conditional replacement of 200 feet of 21-inch concrete force main may follow depending on inspection during construction. It is currently in the design phase, with construction scheduled from March 2027 to October 2027. No cost figures have been published.AI-generated

Current record

FieldValueProvenance
agency.owner SF DPW IDC - Hydraulic reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Hydraulic”
contact.email Lesley.Wong@sfdpw.org reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: Lesley.Wong@sfdpw.org”
contact.name Lesley Wong reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Lesley Wong”
description 2546i_The project involves the replacement of 100LF of the existing 20-inch diameter steel Griffith Dry Weather force main with 20-inch HDPE pipe including all associated restoration work. The majority of the force main is on the Griffith Pump Station grounds with only a small portion on Shafter Ave in the public ROW. There is also conditional work to replace 200 LF of the 21-inch concrete force main with HDPE pipe which is dependent upon inspection of the pipe during construction reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: 2546i_The project involves the replacement of 100LF of the existing 20-inch diameter steel Griffith Dry Weather force main with 20-inch HDPE...”
location.geometry 2 geometries reported socrata:btxj-k9uh · retrieved 2026-08-27
“2 published segment geometries”
location.street_limits Griffith St; Shafter Ave from End to Griffith St derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name Griffith DW Force Main Rehabilitation reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: Griffith DW Force Main Rehabilitation”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Sanitary Sewer reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Sanitary Sewer”
schedule.end 2027-10-18 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-10-18T00:00:00.000”
schedule.start 2027-03-22 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-03-22T00:00:00.000”
source.project_id 51430 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 51430”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”
summary The Griffith DW Force Main Rehabilitation is an active sanitary sewer project owned by San Francisco Public Works,... generated llm:summarize · retrieved 2026-07-18
“generated from 13 resolved fields; input sha256-v2=66720938f6fd9355c595002b5ce4fd1b670dc33fe8f19e2207ee8c55834e59db”

Changes

2026-08-27 field changed immaterial {'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.38055937631314, 37.7252720543326], [-122.38137737446074, 37.72573637311456]]}, {'type': 'Point', 'coordinates': [-122.38137737440833, 37.72573637318027]}]}{'type': 'GeometryCollection', 'geometries': [{'type': 'LineString', 'coordinates': [[-122.38055938, 37.72527205], [-122.38137737, 37.72573637]]}, {'type': 'Point', 'coordinates': [-122.38137737, 37.72573637]}]}

Source records

Public Works coordinated projects (DotMaps) key 51430 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 2 geometries reported 2026-08-27 live
summary The Griffith DW Force Main Rehabilitation is an active sanitary sewer project owned by San Francisco Public Works, located on the Griffith Pump Station grounds and a short section of Shafter Avenue. The project will replace about 100 feet of the existing 20-inch steel dry-weather force main with 20-inch HDPE pipe, plus associated restoration; a conditional replacement of 200 feet of 21-inch concrete force main may follow depending on inspection during construction. It is currently in the design phase, with construction scheduled from March 2027 to October 2027. No cost figures have been published. generated 2026-07-18 live
location.geometry 2 geometries reported 2026-07-17 superseded
location.street_limits Griffith St; Shafter Ave from End to Griffith St derived 2026-07-17 live
schedule.end 2027-10-18 reported 2026-07-17 live
schedule.start 2027-03-22 reported 2026-07-17 live
source.project_id 51430 reported 2026-07-17 live
contact.email Lesley.Wong@sfdpw.org reported 2026-07-17 live
contact.name Lesley Wong reported 2026-07-17 live
agency.owner SF DPW IDC - Hydraulic reported 2026-07-17 live
project_type Sanitary Sewer reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description 2546i_The project involves the replacement of 100LF of the existing 20-inch diameter steel Griffith Dry Weather force main with 20-inch HDPE pipe including all associated restoration work. The majority of the force main is on the Griffith Pump Station grounds with only a small portion on Shafter Ave in the public ROW. There is also conditional work to replace 200 LF of the 21-inch concrete force main with HDPE pipe which is dependent upon inspection of the pipe during construction reported 2026-07-17 live
name Griffith DW Force Main Rehabilitation reported 2026-07-17 live