PEFWS Pipeline Contract G - 36-Inch Water
candidate project
Planning
Pre-Planning
74c1844d-e3fd-48df-9a91-5a8ec6ac40ad
The PEFWS Pipeline Contract G – 36-Inch Water project is a planned water pipeline installation by the SF Public Utilities Commission's Engineering Management Bureau in San Francisco's Sunset District, running along stretches of 24th Avenue, 28th Avenue, and Quintara Street. The project is currently in pre-planning, with construction scheduled to begin in October 2028 and finish by January 2032. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF PUC - Engineering Management Bureau |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF PUC - Engineering Management Bureau” |
| contact.email | azhu@sfwater.org |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: azhu@sfwater.org” |
| contact.name | Ada Zhu |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Ada Zhu” |
| location.geometry | 3 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“3 published segment geometries” |
| location.street_limits | 24TH AVE from QUINTARA ST to PACHECO ST; 28TH AVE from ULLOA ST to ORTEGA ST; QUINTARA ST from 28TH AVE to 24TH AVE |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | PEFWS Pipeline Contract G - 36-Inch Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: PEFWS Pipeline Contract G - 36-Inch Water” |
| phase | Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Planning” |
| project_type | Water |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Water” |
| schedule.end | 2032-01-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2032-01-01T00:00:00.000” |
| schedule.start | 2028-10-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2028-10-01T00:00:00.000” |
| source.project_id | 28342 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 28342” |
| status | Pre-Planning |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Pre-Planning” |
| summary | The PEFWS Pipeline Contract G – 36-Inch Water project is a planned water pipeline installation by the SF Public... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 12 resolved fields; input sha256-v2=bed5a3e2ae2c4b4a8cdb585780db6676e990b3d8df234841ed7a0c904fbeb6f6” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 28342 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 3 geometries | reported | 2026-08-27 | live |
| summary | The PEFWS Pipeline Contract G – 36-Inch Water project is a planned water pipeline installation by the SF Public Utilities Commission's Engineering Management Bureau in San Francisco's Sunset District, running along stretches of 24th Avenue, 28th Avenue, and Quintara Street. The project is currently in pre-planning, with construction scheduled to begin in October 2028 and finish by January 2032. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 3 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 24TH AVE from QUINTARA ST to PACHECO ST; 28TH AVE from ULLOA ST to ORTEGA ST; QUINTARA ST from 28TH AVE to 24TH AVE | derived | 2026-07-17 | live |
| schedule.end | 2032-01-01 | reported | 2026-07-17 | live |
| schedule.start | 2028-10-01 | reported | 2026-07-17 | live |
| source.project_id | 28342 | reported | 2026-07-17 | live |
| contact.email | azhu@sfwater.org | reported | 2026-07-17 | live |
| contact.name | Ada Zhu | reported | 2026-07-17 | live |
| agency.owner | SF PUC - Engineering Management Bureau | reported | 2026-07-17 | live |
| project_type | Water | reported | 2026-07-17 | live |
| phase | Planning | reported | 2026-07-17 | live |
| status | Pre-Planning | reported | 2026-07-17 | live |
| name | PEFWS Pipeline Contract G - 36-Inch Water | reported | 2026-07-17 | live |