Train Control Upgrade Project - Phase 1
candidate project
Design
702bcbf7-a1c9-4ba9-abe4-6e7de0e457ad
The Train Control Upgrade Project – Phase 1 is an active roadway project in San Francisco's Mission Bay and southern waterfront area, covering segments of 3rd Street, King Street, and The Embarcadero. It is currently in the design phase, with construction scheduled to run from April to August 2027. The project is listed under SF DPW's Streets & Highways division, though project records indicate the owning agency may actually be the SFMTA Streets Division, with a correction pending. No cost figures have been published.AI-generated
Current record
| Field | Value | Provenance |
|---|---|---|
| agency.owner | SF DPW IDC - Streets & Highways |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF DPW IDC - Streets & Highways” |
| description | The listed agency of "SFDPW IDC Streets & Highway" is incorrect. The actual agency is "SFMTA - Streets Division". I submitted a helpdesk ticket to fix. Construction start date is April 2027. |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“description: The listed agency of "SFDPW IDC Streets & Highway" is incorrect. The actual agency is "SFMTA - Streets Division". I submitted a helpdesk ticket...” |
| location.geometry | 5 geometries |
reported
socrata:btxj-k9uh · retrieved 2026-08-27
“5 published segment geometries” |
| location.street_limits | 3RD ST from MARIN ST to CHANNEL; 4TH ST; CHANNEL ST from 3RD ST to 4TH ST; KING ST from 5TH ST to THE EMBARCADERO; THE EMBARCADERO from TOWNSEND ST to FOLSOM ST |
derived
socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields” |
| name | Train Control Upgrade Project - Phase 1 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“name: Train Control Upgrade Project - Phase 1” |
| phase | Design |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design” |
| project_type | Roadway |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Roadway” |
| schedule.end | 2027-08-31 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2027-08-31T00:00:00.000” |
| schedule.start | 2027-04-01 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2027-04-01T00:00:00.000” |
| source.project_id | 54876 |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 54876” |
| status | Active |
reported
socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active” |
| summary | The Train Control Upgrade Project – Phase 1 is an active roadway project in San Francisco's Mission Bay and southern... |
generated
llm:summarize · retrieved 2026-07-18
“generated from 11 resolved fields; input sha256-v2=542bab8bcf9a3b22363c6427fcb45bd1ad51533a2b6e2fa8bab1273c4eff1c18” |
Changes
| 2026-08-27 | field changed immaterial |
Source records
| Public Works coordinated projects (DotMaps) | key 54876 | primary · rule:dotmaps-group-by-dotmapsid | dataset page ↗ · this record’s data ↗ |
Assertion history (latest 100, including superseded)
| Predicate | Value | Class | Recorded | State |
|---|---|---|---|---|
| location.geometry | 5 geometries | reported | 2026-08-27 | live |
| summary | The Train Control Upgrade Project – Phase 1 is an active roadway project in San Francisco's Mission Bay and southern waterfront area, covering segments of 3rd Street, King Street, and The Embarcadero. It is currently in the design phase, with construction scheduled to run from April to August 2027. The project is listed under SF DPW's Streets & Highways division, though project records indicate the owning agency may actually be the SFMTA Streets Division, with a correction pending. No cost figures have been published. | generated | 2026-07-18 | live |
| location.geometry | 5 geometries | reported | 2026-07-17 | superseded |
| location.street_limits | 3RD ST from MARIN ST to CHANNEL; 4TH ST; CHANNEL ST from 3RD ST to 4TH ST; KING ST from 5TH ST to THE EMBARCADERO; THE EMBARCADERO from TOWNSEND ST to FOLSOM ST | derived | 2026-07-17 | live |
| schedule.end | 2027-08-31 | reported | 2026-07-17 | live |
| schedule.start | 2027-04-01 | reported | 2026-07-17 | live |
| source.project_id | 54876 | reported | 2026-07-17 | live |
| agency.owner | SF DPW IDC - Streets & Highways | reported | 2026-07-17 | live |
| project_type | Roadway | reported | 2026-07-17 | live |
| phase | Design | reported | 2026-07-17 | live |
| status | Active | reported | 2026-07-17 | live |
| description | The listed agency of "SFDPW IDC Streets & Highway" is incorrect. The actual agency is "SFMTA - Streets Division". I submitted a helpdesk ticket to fix. Construction start date is April 2027. | reported | 2026-07-17 | live |