agency.owner SF Bay Ferry reported socrata:btxj-k9uh · retrieved 2026-07-17
“agency_name: SF Bay Ferry”
contact.email hank.phan@sfbayferry.com reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_email: hank.phan@sfbayferry.com”
contact.name Hank Phan reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_manager_name: Hank Phan”
description SF Bay Ferry (WETA) is proposing to bring 10MW from PG&E substation at Folsom & Fremont to Sea Wall Lot (SWL) 328 where the 34.5kV switchgear, stepdown transformer and 12.47kV switchgear will be installed. Power will then leave SWL 328 and run north along the Embarcadero to the Downtown SF Ferry Terminal where it will enter a transition vault to distribute to Gates E, F, and G. The project team is requesting utility and facility information for the following streets and sidewalks to identify conflicts. reported socrata:btxj-k9uh · retrieved 2026-07-17
“description: SF Bay Ferry (WETA) is proposing to bring 10MW from PG&E substation at Folsom & Fremont to Sea Wall Lot (SWL) 328 where the 34.5kV switchgear,...”
location.geometry 12 geometries reported socrata:btxj-k9uh · retrieved 2026-07-17
“12 published segment geometries”
location.street_limits BEALE ST from HARRISON ST to FOLSOM ST; FOLSOM ST from FREMONT ST to THE EMBARCADERO; FREMONT ST from FOLSOM ST to HARRISON ST; HARRISON ST from FREMONT ST to THE EMBARCADERO; HOWARD ST from SPEAR ST to THE EMBARCADERO; MAIN ST from HARRISON ST to FOLSOM ST; MISSION ST; SPEAR ST from END: 400-499 BLOCK to MISSION ST; STEUART ST from FOLSOM ST to DON CHEE WAY; THE EMBARCADERO from BRANNAN ST to MISSION ST; THE EMBARCADERO from HOWARD ST to HARRISON ST; THE EMBARCADERO from HOWARD ST to MISSION ST derived socrata:btxj-k9uh · retrieved 2026-07-17
“assembled from segment on/from/to street fields”
name SF Bay Ferry Downtown Ferry Terminal Electrification Project reported socrata:btxj-k9uh · retrieved 2026-07-17
“name: SF Bay Ferry Downtown Ferry Terminal Electrification Project”
phase Design reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_phase: Design”
project_type Electrical Distribution reported socrata:btxj-k9uh · retrieved 2026-07-17
“facility_type: Electrical Distribution”
schedule.end 2028-06-30 reported socrata:btxj-k9uh · retrieved 2026-07-17
“end_date: 2028-06-30T00:00:00.000”
schedule.start 2024-04-01 reported socrata:btxj-k9uh · retrieved 2026-07-17
“start_date: 2024-04-01T00:00:00.000”
source.project_id 55060 reported socrata:btxj-k9uh · retrieved 2026-07-17
“dotmapsid: 55060”
status Active reported socrata:btxj-k9uh · retrieved 2026-07-17
“project_status: Active”

Source records

Public Works coordinated projects (DotMaps) key 55060 primary · rule:dotmaps-group-by-dotmapsid dataset page ↗ · this record’s data ↗

Assertion history (latest 100, including superseded)

PredicateValueClassRecordedState
location.geometry 12 geometries reported 2026-07-17 live
location.street_limits BEALE ST from HARRISON ST to FOLSOM ST; FOLSOM ST from FREMONT ST to THE EMBARCADERO; FREMONT ST from FOLSOM ST to HARRISON ST; HARRISON ST from FREMONT ST to THE EMBARCADERO; HOWARD ST from SPEAR ST to THE EMBARCADERO; MAIN ST from HARRISON ST to FOLSOM ST; MISSION ST; SPEAR ST from END: 400-499 BLOCK to MISSION ST; STEUART ST from FOLSOM ST to DON CHEE WAY; THE EMBARCADERO from BRANNAN ST to MISSION ST; THE EMBARCADERO from HOWARD ST to HARRISON ST; THE EMBARCADERO from HOWARD ST to MISSION ST derived 2026-07-17 live
schedule.end 2028-06-30 reported 2026-07-17 live
schedule.start 2024-04-01 reported 2026-07-17 live
source.project_id 55060 reported 2026-07-17 live
contact.email hank.phan@sfbayferry.com reported 2026-07-17 live
contact.name Hank Phan reported 2026-07-17 live
agency.owner SF Bay Ferry reported 2026-07-17 live
project_type Electrical Distribution reported 2026-07-17 live
phase Design reported 2026-07-17 live
status Active reported 2026-07-17 live
description SF Bay Ferry (WETA) is proposing to bring 10MW from PG&E substation at Folsom & Fremont to Sea Wall Lot (SWL) 328 where the 34.5kV switchgear, stepdown transformer and 12.47kV switchgear will be installed. Power will then leave SWL 328 and run north along the Embarcadero to the Downtown SF Ferry Terminal where it will enter a transition vault to distribute to Gates E, F, and G. The project team is requesting utility and facility information for the following streets and sidewalks to identify conflicts. reported 2026-07-17 live
name SF Bay Ferry Downtown Ferry Terminal Electrification Project reported 2026-07-17 live